Laserfiche WebLink
v� n <br /> 0 0 <br /> oCollege Park at Mountain House Specific Plan III i <br /> 0 1 Mitigation Monitoring and Reporting Program <br /> MitigationMeasure Timing/Schedule Implementation Implementation&Verification <br /> o Responsibility Action Date Completed <br /> omonitored at the County's discretion by <br /> S qualified hazardous materials experts(either <br /> qualified County.staff or consultants) for <br /> signs of potential_pesticide, hydrocarbon, or <br /> e'— other contamination. If the County or <br /> consultants observe soil discoloration, <br /> noxious odors, or other signs of potential <br /> contamination,:Phase Il testing.(excavation, <br /> laboratory testing of soil,possibly <br /> groundwater testing) shall be undertaken, <br /> and any recommendations made by the <br /> consultants shall be implemented. <br /> The:San Joaquin County Environmental <br /> Health Department shall have regulatory <br /> authority over the investigation and clean-up <br /> @ ntamination from underground storage <br /> t, ;releases and would provide "no further <br /> 3 <br /> WORn:required" determinations for that <br /> meq,of contamination. All aboveground <br /> e tanks (ASTs)and underground <br /> oVOWtanks (liSTs)at.the,project site shall <br /> o bsoyed:under,.the.supervision of a <br /> ed,hazardous material expert in <br /> a acenrdance with applicable regulations and <br /> removalpermit requirements from the <br /> County Environmental Health Department. <br /> Dairy waste ponds or any other sources of <br /> n r contaminations shall be removed under a <br /> aqualified:hazardous materials expert in <br /> accordance with applicable regulations and <br />