My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006110
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MOUNTAIN HOUSE
>
22801
>
2600 - Land Use Program
>
PA-0500544
>
SU0006110
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2019 1:43:47 PM
Creation date
9/6/2019 10:18:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006110
PE
2611
FACILITY_NAME
PA-0500544
STREET_NUMBER
22801
Direction
S
STREET_NAME
MOUNTAIN HOUSE
STREET_TYPE
PKWY
City
MOUNTAIN HOUSE
APN
20908025
ENTERED_DATE
7/5/2006 12:00:00 AM
SITE_LOCATION
22801 S MOUNTAIN HOUSE PKWY
RECEIVED_DATE
7/3/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\M\MOUNTAIN HOUSE PKWY\22801\PA-0500544\SU0006110\CDD OK.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. Except when the MHCSD General Manager specifies otherwise, when a sound wall is <br /> installed on an arterial street, the adjacent street edge landscaping, sidewalk, and street <br /> curb& gutter shall also be installed. <br /> 22. Best Management Practices: <br /> A. To control erosion and sedimentation during project construction and operation, the <br /> developer shall comply with MHMP policies, MHMP mitigation measures, and Phase I <br /> and II NPDES permit requirements, including the preparation and implementation of a <br /> SWPPP that outines BMPs to be followed to minimize erosion and sedimentation during <br /> project construction and operation. <br /> B. All non-residential (Le. Office, Industrial, Commercial, Neighborhood Commercial etc), <br /> uses must perform a pretreatment of all storm flows before the flows enter a public <br /> storm system. The design shall be in accordance with the Storm Water Master Plan <br /> Update and NPDES requirements. The MHCSD shall review and approve the plans and <br /> the specifications for the storm pretreatment prior to issuance of the building permit. <br /> C. The applicant shall construct catch basin filters, Water Decontaminator Model WD- <br /> C Ox18A as manufactured by Inventive Resources or approved equal, and/or other <br /> source control Best Management Practices (BMPs)for urban runoff from Tract 3557 <br /> prior to issuance of the first building permit. <br /> D. Construction-Related Erosion: The applicant and/or contractor shall comply with <br /> applicable NPDES General Construction Activities Storm Water Permit requirements <br /> established by the Clean Water Act. Pursuant to the NPDES Storm Water Program, an <br /> application for coverage under the statewide General Construction Activities Storm <br /> Water Permit (General Permit)shall be obtained for project development prior to the <br /> issuance of grading permits. The applicant and/or contractor shall obtain coverage <br /> under the General Permit by filing a Notice of Intent with the State Water Resource <br /> Control Board's (SWRCB) Division of Water Quality. The filing shall describe erosion <br /> control and storm water treatment measures to be implemented during and following <br /> construction and provide a schedule for monitoring performance. MHCSD approved <br /> BMPs shall serve to control point and non-point source pollutants in storm water and <br /> shall constitute the project's storm water pollution prevention program (SW PPP)for <br /> construction activities. Timing: All applicable permits shall be obtained prior to the <br /> issuance of grading permits for Tract 3557. <br /> 23. Storm Drains: <br /> A. The developer shall fund, design and construct the required storm drainage system in <br /> accordance with the requirements of the Storm Water Master Plan Update and the <br /> MHCSD's Standards and Specifications to serve Tract 3557 unless otherwise required <br /> or approved by the General Manager of the MHCSD. <br /> B. The developer shall build the required drainage system and water quality basins and <br /> improve the creek as required by MHCSD to accommodate runoff from the project. The <br /> developers shall expand WQB1 as required by MHCSD to accommodate runoff from the <br /> project before development of those portions are to be served by the DeAnza Boulevard <br /> and Mountain House Parkway storm-drain systems. The basin shall be expanded to a <br /> capacity necessary to serve Tract No. 3557. The configuration shall be as per the <br /> Storm Water Master Plan Update. The Water Quality Basin shall be dedicated to <br /> MHCSD. <br /> C. Water Decontaminator Model WD-10x18A as manufactured by Inventive Resources or <br /> approved equal catch basin inserts shall be installed prior to issuance of the first building <br /> permit. <br /> 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.