My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006110
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MOUNTAIN HOUSE
>
22801
>
2600 - Land Use Program
>
PA-0500544
>
SU0006110
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2019 1:43:47 PM
Creation date
9/6/2019 10:18:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006110
PE
2611
FACILITY_NAME
PA-0500544
STREET_NUMBER
22801
Direction
S
STREET_NAME
MOUNTAIN HOUSE
STREET_TYPE
PKWY
City
MOUNTAIN HOUSE
APN
20908025
ENTERED_DATE
7/5/2006 12:00:00 AM
SITE_LOCATION
22801 S MOUNTAIN HOUSE PKWY
RECEIVED_DATE
7/3/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\M\MOUNTAIN HOUSE PKWY\22801\PA-0500544\SU0006110\CDD OK.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
as the river discharges commence. Initiation of State Permit Application for land <br /> application of the treated discharge requirement shall parallel the treatment plant <br /> capacity condition noted above, as directed by the General Manager. <br /> C. The Wastewater Treatment Plant expansion requirement in Condition 26.A shall meet <br /> the requirements. of the Regional Water Quality Control Board (RWQCB) effluent <br /> permits, including compliance scheduling, testing and any infrastructure that may be <br /> required for long-term discharge into Old River. Additional treatments that may be <br /> required by the RWQCB for such pollutants as dissolved solids, metals and heat, <br /> etc., shall be addressed in the plant expansion. The developer shall bond for or fund <br /> construction for the developer's fair share cost prior to the filing of the first Final Map. <br /> 27. Water Treatment Plant: Under the direction of the MHCSD, the applicant shall fund, design <br /> and construct the last phased expansion of the water treatment plant(WTP)to provide the <br /> capacity required to serve Tract No.3557 prior to Issuance of the first building permit. <br /> Recognizing that there may be agreements between the developers for sharing capacity and <br /> also recognizing that the MHCSD is not a party to and has no control over such agreements, <br /> bonding for construe ion shall be provided prior to approval of the first final map and <br /> beginning of constru(:tion shall be at the discretion of the General Manager. Issuance of <br /> building permits shal cease if construction does not begin when directed by the General <br /> Manager. <br /> 28. Other Water System Facilities: Water storage requirements, booster pump station and <br /> looping of the water distribution system pipelines shall be done in accordance with the Water <br /> Master Plan and as directed by the MHCSD prior to issuance of the first building permit in <br /> SP III. Construction of one tank may be allowed if an engineering analysis shows that the <br /> second tank may be constructed at a later date without adverse impact on the first tank <br /> and/or existing customers of MHCSD. Each phase of SPIII will be reviewed to confirm the <br /> existing"in-place" infrastructure is adequate to provide MHCSD Design Standards. <br /> 29. BBID Canal: The applicant shall reroute the canals as directed by BBID in order to ensure <br /> continued supply of agricultural irrigation water to lands remaining in agricultural use <br /> following construction. Timing: Approval of the rerouting and grading and improvement <br /> plans approved by MHCSD prior to approval of first Final Map. <br /> 30. Hold Harmless Provision: The subdivider shall defend, indemnify, and hold harmless the <br /> MHCSD, its agents, officers, and employees, from any claim, action, or proceeding against <br /> the MHCSD, its agents, officers, or employees, to attack, set aside, void, or annul an <br /> approval of MHCSD concerning any MHCSD condition,which action is brought within the <br /> time provided for in Section 66499.37 of the Government Code. <br /> 31. Landscaping and Architecture: <br /> A. The All in-tract landscaping and utility R/W areas and all other landscape areas <br /> including Parks"A4', "B"and all open space areas that were not in the original Master <br /> Plan, the MHCSD Parks, Recreation and Leisure Plan, the TIF or the CFF (January, <br /> 2003)as determined by MHCSD, will require a funding mechanism such as HOA or <br /> Landscape and Lighting Maintenance District as determined by MHCSD. These areas <br /> will require establishment of a maintenance entity or financing mechanism acceptable to <br /> MHCSD to provide funding for maintenance of, and if necessary, replacement at the end <br /> of the useful life of improvements including, but not limited to landscaping, pathways, <br /> walls, and all improvements serving or for the special benefit of this subdivision. The <br /> financing mechanism shall be completed and adopted by the Board of Directors prior to <br /> the approval of the first Final Map. <br /> B. The Applicant shall comply with the landscaping and architectural theme to be used <br /> within the entire Neighborhood 'A/B'. Design shall be consistent with all Community <br /> 24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.