Laserfiche WebLink
"OBJECTION: As noted above,what is the extent of the expansion? Under this type of <br /> application it is limited to a 35 percdnt Increase. What was.the�prior use,and on what portion <br /> of the.propoW This was raised In the Objection with great detail,and has not been <br /> addressed by this condition. Thfs'ellcation will result inifullblown manufacturing In an <br /> agricultural tont with limitation,as has occurred to date. The revised site plan was not <br /> property served on the neighbors,dwrafore due process,IS'violeted. It also needs to be <br /> Identified what agricultural economy is supported. How does one distinguish between <br /> agricultural manufacturing and general manufacturing? It is alleged that the potato <br /> equipment is simply general manufacturing as it is not related to agriculture in the local <br /> economy." <br /> Resmnse to Aooeai Statement <br /> A Site Approval application is not limited to a 25 percent expansion;it can expand a use greater than 25 <br /> percent The extent of the expansion Is shown on the Revised Site Plan dated February 5,2002. <br /> Development Tide Section 5-115.412 provides an explanation of the Custom Agricultural Manufacturing use <br /> type. The following definition is inducted in Condition 1.b:: 'The Custom Agricultural Mariutacturirg use type <br /> includes the manufachuring and repair of agricultural equipment where such equipment is <br /> prl vw*used to support the agricultural economy. Customized agricultural equipment includes specialty <br /> sgrk ukural equipment which is not commonly available to farmers on the rets market. For a business to <br /> meet the requiverrAints of this use type,they'must manufacture and repair custom equipment that is primarily <br /> used lo the agricultural economy.'_The Community Development Department required that the applicants <br /> provide a new Site PlanInd.dicating additional detail;partly as a mutt of comments from neighbors. The <br /> char4es included adding the.square toatages and use of the buMngs to the Site Plan. The addition of <br /> time items did not matte the PrP1W ditrmht enough from the re}errdl seat to the neighbors to warrant <br /> the project being}referred again. Typically,a pry is only re-referred when an aspect of the project <br /> ct enough to make the pro significantly different from the or%ougly referred projsct. It is the <br /> Community Development Departments understanding that the perthto.equlprrrent referenced In Appeal � <br /> Statement 9 is used to sort potatoes by size using laser technology. The applicants indicate that this <br /> and vegetables;however it has !application. if the <br /> equipment may be used to size other fruits with <br /> the <br /> appawts have information to the contrary,it should have been submitted ppm <br /> c STORM DRAINAGE: All stow:;wafter drainage shall be retained on-site. The drainage pattern and <br /> corresponding storm drain improvements shall be shown on the Improvement Plan. Drainage <br /> calculations prepared by a registered civil engineer or architect shall be included. (Development Title <br /> Section 9-1135) <br /> this was addressed In`do prior Use Permlt,and once again <br /> "OBJECTION: No comment,but <br /> the nerd for this requirement speaks to the nature of the changes which would warrant <br /> groatsr detike and inftrmation, which should net normally be needed with a 25 percent <br /> expansion." <br /> ROARM to 69929- 19 <br /> This is an ordinance requirement that is placed on all pmlects that do not have terminal storm drainage. <br /> San Joaquin County PA-02-12 8 <br /> Paggee 8 <br /> Community Development <br />