My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004098
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KOSTER
>
35775
>
2600 - Land Use Program
>
PA-0300550
>
SU0004098
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:30:31 AM
Creation date
9/6/2019 10:43:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004098
PE
2605
FACILITY_NAME
PA-0300550
STREET_NUMBER
35775
Direction
S
STREET_NAME
KOSTER
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
35775 S KOSTER RD
RECEIVED_DATE
3/10/2004 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\K\KOSTER\35775\PA-0300550\SU0004098\APPL.PDF \MIGRATIONS\K\KOSTER\35775\PA-0300550\SU0004098\CDD OK.PDF \MIGRATIONS\K\KOSTER\35775\PA-0300550\SU0004098\EH COND.PDF \MIGRATIONS\K\KOSTER\35775\PA-0300550\SU0004098\CORRESPOND.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
683
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Joaquin County Community Environmental Setting,Impacts,and Mitigation Measures <br /> Development Department Transportation and Traffic <br /> Table 3.1-40. Year 2027 Baseline and Year 2027 Plus Project Peak Hour Intersection Operations with <br /> Proposed SR 132/Bird Road Interchange (Worst-Case Alternative) <br /> 2027 Baseline Plus <br /> 2027 Baseline Project Impact Summary <br /> Peak Peak Delay <br /> Hour Delay LOS Hour Delay LOS Change Significant <br /> Westbound 132/Bird Road AM 24.5 C AM 27.2 D +2.7 Yes <br /> Ramps* PM 11.4 B PM 11.4 B 0 No <br /> Eastbound 132/Bird Road AM 13.6 B AMS 14.0 B +0.4 No — <br /> Ramps* PM 10.7 B PM 10.7 B 0 No <br /> Bird Road/Blewett Road* AM 13.7 B AM 11.4 B -2.3 No <br /> PM 11.4 B PM 14.1 B +2.7 No — <br /> Koster Road/Blewett Road* AM 11.4 B AM 9.4 B -2.0 No <br /> PM 9.4 A PM 11.5 A +2.1 No <br /> Koster Road/Project Entrance* AM n/a n/a AM 8.4 A No <br /> PM n/a n/a PM 8.5 A No <br /> Note: LOS—Minor Street Approach Level of Service for Two-way-stop-controlled intersections. <br /> *Intersections evaluated as Two Way Stop Control Intersections with stop-signs on minor road approaches. <br /> Source: Omni-Means 2005. <br /> Freeway Weaving Segments. Table 3.L41 presents the projected weaving — <br /> operation between the I-5/SR 132 and SR 132/Bird Road interchanges for 2027 <br /> Baseline and 2027 Baseline plus Project conditions. The first segment(referred <br /> to as Location 1 in Table 3.L41)is the weave on westbound SR 132 between the <br /> southbound I-5 direct off-ramp to westbound SR 132 and the westbound SR 132 <br /> off-ramp to Bird Road. The second segment(Location 2 in Table 3.L41)is the <br /> weave on eastbound SR 132 between the Bird Road on-ramp and the eastbound _ <br /> SR 132 direct off-ramp to southbound 1-5. As shown in Table 3.L-41,weave <br /> sections are projected to operate at LOS "D"on westbound SR 132 during the <br /> AM peak hour and LOS "D"on eastbound SR 132 during the PM peak hour <br /> (Omni-Means 2005). <br /> DeSilva Gates Quarry Project — <br /> Draft Environmental Impact Report 31-34 <br /> ass 05105Z5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.