Laserfiche WebLink
San Joaquin County Community Environmental Setting,Impacts,and Mitigation Measures <br /> Development Department Transportation and Traffic <br /> Table 3.L-41. SR 132 between 1-5/Bird Road Interchanges Weaving Operations Year 2027 Baseline and <br /> Year 2027 Plus Project Conditions' Levels of Service (LOS)with Four-Lane Freeway with Proposed SR <br /> 132/131rd Road Interchange (Worst-Case Alternative) <br /> AM Peak Hour PM Peak Hour <br /> ` Number of Number of <br /> Number of Basic Lanes(N) Number of Basic Lanes(N) <br /> Lanes(NB)in in Weaving Lanes(NB)in in Weaving <br /> Weaving Segment Weaving Section Section LOS Weaving Section Section LOS <br /> 2027 Baseline <br /> Location 1 2 3 D 2 3 A <br /> Location 2 2 3 A 2 3 D <br /> ` 2027 Baseline Plus Project <br /> Location 1 2 3 D 2 3 A <br /> Location 2 2 3 A 2 3 D <br /> Source: Leisch Method(HDM,Figure 504.7A)in Omni-Means 2005. <br /> r Weaving section calculations under year 2027 plus project conditions were also <br /> evaluated within the I-5/SR 132 freeway-to-freeway interchange. Table 3.L-42 <br /> shows the projected weaving operations for 2027 Baseline and 2027 Baseline <br /> plus Project conditions within this interchange. The first segment(Location 1) is <br /> ` the weave on westbound SR 132 between the northbound I-5 loop off-ramp and <br /> the loop on-ramp to southbound I-5; the second segment(Location 2)is weave <br /> on eastbound SR 132 between the southbound 1-5 loop off-ramp and the loop on- <br /> ramp to northbound I-5;the third segment(Location 3)is the weave on <br /> northbound 1-5 between the eastbound SR 132 loop on-ramp and the loop off- <br /> ramp to westbound SR 132; and the fourth segment(Location 4) is the weave on <br /> + southbound I-5 between westbound SR 132 loop on-ramp and the loop off-ramp <br /> to eastbound SR 132. As shown in Table 3.L-42, all weave sections are <br /> projected to operate at Levels of Service"C"or better during both the AM and <br /> PM peak hour periods with the exception of LOS "D"projected during the PM <br /> peak hour at Location 2 (Omni-Means 2005). <br /> + <br /> DeSilva Gates Quarry Project <br /> Draft Environmental Impact Report 31-35 <br /> AS 05105.05 <br /> + <br />