Laserfiche WebLink
San Joaquin County Community Environmental Setting, Impacts,and Mitigation Measures <br /> Development Department Transportation and Traffic <br /> Impacts and Mitigation Measures <br /> Impact TR-1: Cause Disruptions to Pedestrian and <br /> Bicycle Traffic or Public Transportation Systems (No <br /> Impact) <br /> Because of the lack of bus service in the project area, the lack of designated <br /> bicycle routes, pedestrian access, and the small number of employees anticipated, <br /> the proposed Project would not cause disruptions to pedestrian and bicycle traffic <br /> or public transportation systems. There would be no impact. No mitigation is <br /> required. <br /> Impact TR-2: Increase in Peak Hour Traffic Volumes on <br /> SR 132 East of 1-5 (Less than Significant) <br /> The existing two-lane segment of SR 132 to the east of I-5 currently experiences <br /> LOS "T" during the AM and PM peak hours and is projected to continue at this <br /> level through the year 2007 (baseline conditions). In 2007,the Project is <br /> anticipated to contribute four(4) additional vehicle trips to this segment of SR <br /> 132 during the AM peak hour and zero (0) vehicle trips during the PM peak hour. <br /> As such, the project would not be expected to exacerbate peak hour <br /> conditions on SR 132 and the project's impacts would be less than <br /> significant. No mitigation is required. <br /> Impact TR-3: Structural Damage to Bird Road (Less than <br /> Significant) <br /> All project truck traffic would use Koster Road between the project's quarry <br /> entrance south to Blewett Road, Blewett Road between Koster Road and Bird <br /> Road, and Bird Road between Blewett Road and SR 132. Based on the existing <br /> _ condition of Bird Road from south of Blewett Road north to SR 132 and the <br /> calculated year 2007 base condition TI values, the Project would result in less- <br /> than-significant structural impacts on Bird Road. No mitigation is required. <br /> Impact TR-4: Structural Damage to Koster Road and <br /> Blewett Road (Less than Significant with Mitigation <br /> Incorporated) <br /> _ Based on the existing condition of Koster Road from the Project's entrance south <br /> to Blewett Road and on segments of Blcwett Road between Koster Road and <br /> Bird Road, and based on the calculated year 2007 base condition TI values,the <br /> Project would result in significant structural impacts on Koster Road and Blewett <br /> Road. Implementation of Mitigation Measure TR-4 would reduce these <br /> impacts to a less-than-significant level. <br /> DeSilva Gates Quarry Project <br /> Draft Environmental Impact Report 31-39 <br /> As 05105.05 <br />