Level of Significance After Mitigation: Significant <br /> Impact 4—Traffic Signal Warranted at the Bird Road/SR-132 Eastbound Ramps Intersection <br /> The year 2027 base conditions operational analysis indicated that the SR-132 eastbound ramps/Bird Road <br /> intersection geometries will provide sufficient capacity at acceptable Levels of Service. The traffic study <br /> prepared in support of the interchange project,however, identified that a traffic signal would be warranted <br /> by the year 2027 at this intersection. This is a less-than-significant impact with mitigation. — <br /> Mitigation Measure 4 <br /> The installation of a traffic signal at the Bird Road/SR-132 eastbound ramps intersection is not warranted <br /> when the interchange is first constructed and open for use, and is not projected to be warranted for at least <br /> 15-20 years. As such,the traffic signal will not be installed as part of the interchange project but would be — <br /> installed when traffic or safety warrants its' installation. <br /> Level of Significance After Mitigation: Less-Than-Significant <br /> Impact 5—Structural Damage to Existing County Roadways <br /> Traffic forecasted for the year 2027 base condition would increase the structural section T.I. resulting in — <br /> impacts to the structural sections on Bird Road, Blewett Road and Koster Road within the study area. <br /> This is a significant impact which can be reduced to less than significant with mitigations. <br /> Mitigation Measure 5 <br /> To mitigate the year 2027 base condition would require reconstructing Koster Road from SR-132 south to <br /> Blewett Road to provide a 32-foot paved roadway surface with 50 feet of right of way according to the <br /> County's typical rural road sections. The roadway structural section would need to be designed based on a <br /> calculated T.I. of 9.5. The existing conditions T.I. and the year 2007 base conditions T.I. was calculated _ <br /> at 9.0. <br /> Reconstruct Blewett Road segments that are less than the County's rural road standard between Koster — <br /> Road and Bird Road to provide a 32-foot paved roadway surface with 50 feet of right of way according to <br /> the County's typical rural road sections. The roadway structural section would need to be designed based <br /> on a calculated T.I. of 11.5. The existing conditions T.I. was calculated at 9.0 and a T.I. value of 9.5 was <br /> calculated for year 2007 base conditions. _ <br /> Add an AC lift on Bird Road north of Blewett Road sufficient to accommodate a calculated T.I. of 12.5. <br /> The existing conditions T.I. and the year 2007 base conditions T.I. was calculated at 10.5. <br /> Level of Significance After Mitigation: Less-Than-Significant <br /> TRANSPORTATION AND CIRCULATION IMPACTS — YEAR 2027 PLUS PROJECT <br /> CONDITIONS <br /> Impact 6A—Change in Level of Service on SR 132 between the I-580 and I-5 Interchanges <br /> The year 2027 base conditions weave section, ramp junction and mainline peak hour analysis identified — <br /> projected Levels of Service with a four-lane freeway between the I-580 and I-5 interchanges that would <br /> 2'Draft DeSilva Gates Quarry Trafc&Circulation Analysis 51 October 1005 <br /> Jones&Stokes (R905TIS001/15-4000-01) <br />