My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004094
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KOSTER
>
36736
>
2600 - Land Use Program
>
QX-01-0002
>
SU0004094
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2020 1:02:10 PM
Creation date
9/6/2019 10:43:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004094
FACILITY_NAME
QX-01-0002
STREET_NUMBER
36736
Direction
S
STREET_NAME
KOSTER
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
36736 S KOSTER RD
RECEIVED_DATE
1/8/2002 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\K\KOSTER\36736\QX-01-02_PA-0200065\SU0004094\EIR 2004.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2073
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L <br /> I <br /> perennial vegetation and desert pavement; stabilize surface soil with dust <br /> palliative unless immediate construction is to continue; and use water or <br /> dust palliative to form crust on soil immediately following <br /> clearing/grubbing. (CCHD) <br /> ` — While clearing forms, use single stage pours where allowed;use water <br /> spray to clear forms; use sweeping and water spray to clear forms; use <br /> industrial shop vacuum to clear forms; and avoid use of high pressure air <br /> to blow soil and debris from the form. (CCHD) <br /> — During cut and fill activities, prewater with sprinklers or wobblers to <br /> '` allow time for penetration; prewater with water trucks or water pulls to <br /> allow time for penetration; dig a test hole to depth of cut to determine if <br /> soils are moist at depth and continue to prewater if not moist to depth of <br /> ` cut; use water truck/pull to water soils to depth of cut prior to subsequent <br /> cuts; and apply water or dust palliative to form crust on soil following fill <br /> and compaction. (CCHD) B-25 <br /> � cont. <br /> For large tracts of disturbed land, prevent access by fencing, ditches, <br /> vegetation, berms, or other barriers; install perimeter wind barriers 3 to <br /> ` 5 feet high with low porosity; plant perimeter vegetation early; and for <br /> long-term stabilization, stabilize disturbed soil with dust palliative or <br /> vegetation or pave or apply surface rock. (CCHD) <br /> In staging areas, limit size of area; apply water to surface soils where <br /> support equipment and vehicles are operated; limit vehicle speeds to <br /> L 15 mph; and limit ingress and egress points. (CCHD) <br /> — For stockpiles, maintain at optimum moisture content; remove material <br /> from downwind side; avoid steep sides or faces; and stabilize material <br /> following stockpile-related activity. (CCHD) <br /> — To prevent trackout, pave construction roadways as early as possible; <br /> 6. install gravel pads; install wheel shakers or wheel washers, and limit site <br /> access. (CCHD, SLOCAPCD) <br /> L — Where feasible, use bedliners in bottom-dumping haul vehicles. (Rule 403 <br /> Handbook) <br /> — Grade each phase separately, timed to coincide with construction phase or <br /> grade entire Project, but apply chemical stabilizers or ground cover to <br /> graded areas where construction phase begins more than 60 days after <br /> grading phase ends. (Rule 403 Handbook) <br /> — Following the addition of materials to, or the removal of materials from, <br /> the surface of outdoor storage piles, said piles shall be effectively <br /> L <br /> 17 <br /> L <br />
The URL can be used to link to this page
Your browser does not support the video tag.