Laserfiche WebLink
stabilized of fugitive dust emissions utilizing sufficient water or chemical — <br /> stabilizer/suppressant. (ADEQ) <br /> — During initial grading, earth moving, or site preparation, Projects 5 acres <br /> or greater may be required to construct a paved (or dust palliative treated) <br /> apron, at least 100 ft in length, onto the Project site from the adjacent site if <br /> applicable. (BCAQMD) <br /> — Post a publicly visible sign with the telephone number and person to <br /> contact regarding dust complaints. This person shall respond and take — <br /> corrective action within 24 hrs. (BCAQMD, CCHD) <br /> — Prior to final occupancy, the applicant demonstrates that all ground _ <br /> surfaces are covered or treated sufficiently to minimize fugitive dust <br /> emissions. (BCAQMD) <br /> — Gravel pads must be installed at all access points to prevent tracking of — <br /> mud on to public roads. (SBCAPCD) <br /> B-25 <br /> — Prior to land use clearance, the applicant shall include, as a note on a cont — <br /> separate informational sheet to be recorded with map, these dust control <br /> requirements. All requirements shall be shown on grading and building <br /> plans. (SBCAPCD, SLOCAPCD) <br /> — All roadways, driveways, sidewalks, etc., to be paved should be <br /> completed as soon as possible. In addition, building pads should be laid <br /> as soon as possible after grading unless seeding or soil binders are used. <br /> (SLOCAPCD) <br /> — Barriers with 50 percent or less porosity located adjacent to roadways to <br /> reduce windblown material leaving a site. (Rule 403 Handbook) <br /> — Prohibit all grading activities during periods of high wind (over 15 mph). <br /> (MBUAPCD) <br /> — Pave all roads on construction sites. (MBUAPCD) <br /> — Replant vegetation in disturbed areas as quickly as possible. (BAAQMD) <br /> — Permanent dust control measures in an approved Project revegetation and <br /> landscape plan should be implemented as soon as possible following <br /> completion of any soil disturbing activities. (SLOCAPCD) <br /> — Exposed ground areas that are planned to be reworked at dates greater <br /> than 1 month after initial grading should be sown with a fast-germinating <br /> native grass seed and watered until vegetation is established. <br /> (SLOCAPCD) <br /> — Require a dust control plan for earthmoving operations. (ADEQ) <br /> 18 <br />