My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004149
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KOSTER
>
36869
>
2600 - Land Use Program
>
QX-96-0001
>
SU0004149
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2020 1:00:10 PM
Creation date
9/6/2019 10:44:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004149
FACILITY_NAME
QX-96-0001
STREET_NUMBER
36869
Direction
S
STREET_NAME
KOSTER
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
36869 S KOSTER RD
RECEIVED_DATE
9/22/1996 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\K\KOSTER\36869\QX-96-01_EIR 96-3\SU0004149\PUB REC REL APPL.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
782
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r) <br /> r` <br /> Overburden removal or initial mining activities within 600 feet from the existing <br /> residences for which the mining equipment is not recessed in the pit should be <br /> limited to hours during which operations currently occur(5:00 a.m. to 9:00 p.m.). <br /> Back-up beepers have frequently been cited as a source of annoyance for residential <br /> uses due to the tonal content of the beeping. The following mitigation measure can <br /> -reduce this noise impact to less than significant: <br /> Front-loaders and other equipment which routinely utilize back-up beepers which <br /> will operate at night should be retrofitted with either volume controls (set to the <br /> minimum levels required for safety), strobe lights, or radar-based back-up <br /> beepers. <br /> The recommended mitigation measures to reduce noise impacts to less than significant <br /> will require a mitigation-monitoring program. The mitigation -monitoring program is <br /> recommended as a condition of approval. All previously approved conditions of approval <br /> k shall still apply. <br /> This project is tentatively scheduled to be heard by the Planning Commission on June 6, <br /> 2002. The Community Development Department has reviewed the Revision of <br /> Approved Actions application and responses from other agencies and will be <br /> recommending that the Planning Commission approve the project subject to the <br /> following recommended Conditions of Approval. <br /> pp <br /> Quarry Excavation <br /> Application No. QX-96-1 was approved by the Planning <br /> Commission on . The effective date of approval is . This approval will expire on , <br /> which is 18 months from the date of approval, unless (1) all Conditions of Approval <br /> have been complied with, (2) all necessary.building permits have been'secured and <br /> remain in force, and (3) all necessary permits from other agencies have been <br /> secured and remain in force. <br /> Unless otherwise specified, all Conditions of Approval and ordinance requirements <br /> shall be fulfilled prior to the establishment of the use and the issuance of any <br /> building permits. Those Conditions followed by a Section Number have been <br /> identified as ordinance requirements pertinent to this application. Ordinance <br /> requirements cannot be modified; and, other ordinance requirements may apply. <br /> r 1. COMMUNITY DEVELOPMENT DEPARTMENT (Staff Contact: Jennifer Jolley) <br /> l <br /> a. PROJECT: This approval shall be for a phased 56-year excavation of the 142-acre <br /> site, to a depth of 125 feet as shown on the approved reclamation plan. <br /> b. RECLAMATION PLAN: The Mining and Reclamation Plan shall be prepared by a <br /> registered Civil Engineer, showing drainage, driveway access details, on-site <br /> parking, existing and proposed utility services, grading, and reclamation. Storm <br /> drainage runoff shall be retained on the site. The drainage pattern and <br /> corresponding storm drain improvements shall be shown on the Plan. A plan check <br /> fee as specified by Section 9-240 will be required. The Mining and Reclamation <br /> Plan shall be prepared in accordance with the reclamation standards developed <br /> h <br />
The URL can be used to link to this page
Your browser does not support the video tag.