Laserfiche WebLink
ti.� � ./ �'j __ _`� F'•--'� '�w"F '�wr'y} mow.\1y � � � �\t__^"�. --��.__.... �. <br /> 6 --4 <br /> j� ". - .�'` �6's: ` •`" 4as €�Sa,B,' s .� °a;.a a;{a �_s ,fir ' _. .-: ' 77 - <br /> able-2-1, SUMMARY Q1==IMP` ;77 �w. ...,„ <br /> AC'F8 AI+�t7lNlC3ATlflN MEiSURES�a �t <br /> Leveiof5ignificance <br /> Environmental Impact Before Mitigation Level of Significance <br /> LS g Mitigation Measures After Mitigatfan <br /> LS SU <br /> A video tape of road conditions shall be prepared for all haul routes between the project site access <br /> and SR 132. The condition of the haul routes shall be reviewed with tha County Public Works <br /> Department every five years. A Maintenance Agreement shall be executed with the County to ensure <br /> repair of haul routes on County Roads between the project site access and SR 132. The Maintenance <br /> Agreement shall require a bond or cash deposit in an amount deemed acceptable to PubliWorks, <br /> c <br /> and shall be renewed every five years for the life of the project. <br /> The proponent shall pay a traffic impact mitigation fee based on the average daily trip-ends for the life <br /> expectancy of the project. <br /> Mitigation Measure 4,4-1b(A-2).:4L <br /> Blewett Road shall be reconstructed to provide a 32-foot paved roadway surface with 50 feet of right <br /> �y of way according to County of San Joaquin typical rural road sections for the portions of Blewett Road <br /> CD - the proponent proposes to use. All bridges along such routes shall be certified as sufficient by a <br /> registered structural engineer, or shall be upgraded to accommodate anticipated loads and to provide <br /> a 32-foot wide roadway surface. The improvement plans and specifications shall be prepared by a <br /> registered civil or structural engineer and shall be subject to approval by the Department of Public <br /> Works. <br /> A video tape of road conditions shall be prepared for all haul routes between the project site access <br /> and SR 132. The condition of the haul routes shall be reviewed with the County Public Works <br /> Department every five years. A Maintenance Agreement shall be executed with the County to ensure. <br /> repair of haul routes on County Roads between the project site access and SR 132. The Maintenance <br /> Agreement shall require a bond or cash deposit in an amount deemed acceptable to Public Works, <br /> and shall be renewed every five years for the life of the project. <br /> The proponent shall pay a traffic impact mitigation fee based on the average daily trip-ends for the life <br /> expectancy of the alternative. <br /> Mitigation Measure 4.4-1c(A-3) <br /> The proponent shall contribute a fair-share of the funding required for the Vernalis Interchange <br /> Project. <br /> The proponent shall pay a traffic impact mitigation fee based on the average daily trip-ends for the life <br /> expectancy of the altemative. <br /> LS=less than significant <br /> S=significant A-1 =Proposed Project <br /> SU=significant and unavoidable A-2=Proposed Project with Alternate Northern Access Road <br /> A-3=Proposed Project with Alternate Southern Access Road to New Interchange <br /> A-4=No Project <br />