My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004149
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KOSTER
>
36869
>
2600 - Land Use Program
>
QX-96-0001
>
SU0004149
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2020 1:00:10 PM
Creation date
9/6/2019 10:44:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004149
FACILITY_NAME
QX-96-0001
STREET_NUMBER
36869
Direction
S
STREET_NAME
KOSTER
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
36869 S KOSTER RD
RECEIVED_DATE
9/22/1996 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\K\KOSTER\36869\QX-96-01_EIR 96-3\SU0004149\PUB REC REL APPL.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
782
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A <br /> S <br /> (10)All internal roads planned for long-term use shall be paved. <br /> (11)Excess fugitive windblown dust shall be prevented by planting the proposed row crops as quickly <br /> as possible after excavation activities for each phase have been co <br /> (12)All on-site equipment driven by internal combustion engines shall be properly maintained and <br /> well tuned according to manufacturers'specifications. Mairrteronce records demonstrating this <br /> shall be kept on the site by the proponent and shall be made available to the County upon <br /> request. <br /> (13)Employees shall be encouraged to ride share or carpool to the job site to reduce the amount of <br /> vehicle traffic to and from the project area. <br /> (14)During smog season(May through October),the construc tim period small be lengthened to <br /> minimize the number of vehicles and equipment operating at the same level- <br /> 0 5) <br /> evel-(15)When available,clean diesel powered or electric equipment shall be utilized in lieu of gasoline <br /> powered engines. <br /> 5. U.S. FISH AND WILDLIFE SERVICE <br /> a. ENDANGERED SPECIES ACT: In carrying out the operation of the project,the applicant shad take <br /> no actions that violate the provisions of the State or Federal Endangered Species Act or any <br /> regulations promulgated pursuant thereto. Compliance with said laws shall be the sole responsibility <br /> of the applicant,and the applicant agrees to indemnify,defenc, and hold the County harmless from <br /> and against any claim or action by affected State or Federal agencies as to the project's compliance <br /> with said laws. <br /> b. SAN JOAQUIN COUNTY MULTI-SPECIES HABITAT CONSERVATION AND OPEN SPACE <br /> PLAN(simSCP): As an altemative to the preparation of a Separate HCP.the applicant may <br /> partidpate in and provide mitigation through the SJMSCP_ <br /> 6. STATE QEEARTMENT OF FISH AND GAME <br /> a. WESTERN BURROWING OWL: Within 60 days prior to the beginning of construction activities,or <br /> any project activity likely to impact the burrowing owl,the proponent shall retain a qualified biologist <br /> to conduct a pre-construction survey of the affected area. if active nesting sees are identified,the <br /> proponent shall develop and implement remedial programs in contsuftaticm with Fish and Game. If <br /> no active burrows are found during preconstruction surveys, a letter report documenting survey <br /> methodology and findings shall be submitted to the County and to Fish and Game for review and <br /> approval, and no further mitigation will be required. <br /> San Joaquin County QX-96-11DSS Company <br /> Community Development <br />
The URL can be used to link to this page
Your browser does not support the video tag.