My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0009259
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LAMMERS
>
12067
>
2600 - Land Use Program
>
PA-1200122
>
SU0009259
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:33:55 AM
Creation date
9/6/2019 10:46:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0009259
PE
2631
FACILITY_NAME
PA-1200122
STREET_NUMBER
12067
Direction
W
STREET_NAME
LAMMERS
STREET_TYPE
RD
City
TRACY
APN
21209018 19 31
ENTERED_DATE
7/2/2012 12:00:00 AM
SITE_LOCATION
12067 W LAMMERS RD
RECEIVED_DATE
6/29/2012 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\L\LAMMERS\12067\PA-1200122\SU0009259\APPL.PDF \MIGRATIONS\L\LAMMERS\12067\PA-1200122\SU0009259\CDD OK.PDF \MIGRATIONS\L\LAMMERS\12067\PA-1200122\SU0009259\EH COND.PDF \MIGRATIONS\L\LAMMERS\12067\PA-1200122\SU0009259\CORRESPOND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Gilton Resource Recovery <br /> Food By-Product / Feed Production Site <br /> Odor Impact Minimization Plan <br /> A. Receipt of Materials <br /> From June to October operating hours will normally be between 6:00 AM and <br /> 8:00 PM; with occasional early morning or late evening deliveries.From March to <br /> May typical operating hours will be 7:00 AM to 5:00 PM with no deliveries made <br /> outside those hours. During the months of November to February we may <br /> operate from 7:00 AM to 5:00 PM but deliveries will be limited to only the amount <br /> of material that can be solar dried that day. No materials will be received that <br /> cannot be spread for drying within twenty-four (24) hours after delivery. No <br /> deliveries will be made to the Site when existing or predicted weather conditions <br /> are such that we could not reasonably be expected to dry the material within two <br /> (2) days. <br /> B. Drying and Removal of the Material <br /> Preprocessed materials are thinly spread on the asphalt and concrete drying <br /> pads. Based on time, temperature and wind conditions the materials are turned <br /> and aerated multiple times to facilitate and accelerate the drying process. Once <br /> the moisture content of the material reaches a range of 10 to 25percent, the <br /> material is removed from the pad. Dried material is stored briefly at the Site and <br /> then trucked directly to end users or to our processing / warehousing facility in <br /> the Port of Stockton. <br /> C. Moisture Content of Materials <br /> Material delivered to the Site will have been preprocessed to the point where the <br /> moisture content does not exceed 55 percent. At that point there is little, if any <br /> free liquid. Materials will be removed from the Site when the moisture content <br /> has reached a range of 10 to 25percent or in the case where weather conditions <br /> will not allow drying operations to begin within two (2) days. <br /> D. Feedstock Characteristics <br /> The Site would be receiving the following types of organic materials that have <br /> been preprocessed to remove excess moisture: <br /> Tomato Pumice --FG-rape Pumice <br /> Sweet Potatoes Potatoes <br /> Pumpkins Parsley <br /> Corn - Rice _ ! <br /> Almonds /Almond Shells Rice Hulls <br /> OIMP <br /> Page 4 <br /> 2012-126 Attachments Attachment No 3-OIMP 12-06-20.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.