Laserfiche WebLink
'OpOU.IN_COC COUNTY OF SAN JOAQUIN THOMAS R.FLINN <br /> ni <br /> DEPARTMENT OF PUBLIC WORKS DEPUTY DIRECTOR <br /> P.O. BOX 1810-1810 E.HAZELTON AVENUE <br /> �4<it6A'�P• STOCKTON,CALIFORNIA 95201 <br /> THOMAS M.GAU <br /> (209)4683000 DEPUTY DIRECTOR <br /> MANUEL LOPEZ FAX(209)468-2999 <br /> DIRECTOR <br /> �� STEVEN WINKLER <br /> CeI EFO DEPUTYDIRECTOR <br /> April 10, 2001 0 <br /> APR 11 2001 <br /> MEMORANDUM Community Development Dept. <br /> TO: Kerry Sullivan, Deputy Director <br /> Community Development Department <br /> CONTACT PERSON: Jeff Fisher <br /> Gk <br /> FROM: Gabriel Karam, Senior Civil Engineer <br /> Public Services Division <br /> SUBJECT: SA-01-21 A SITE APPROVAL APPLICATION TO CONSTRUCT A 49 MW <br /> PEAKING POWER PLANT THAT WOULD PRIMARILY OPERATE DURING <br /> TIMES OF PEAK POWER DEMANDS. THE PLANT WOULD HAVE THE <br /> CAPABILITY TO MEET THE ELECTRICAL NEEDS OF APPROXIMATELY <br /> 50,000 RESIDENTS OF SAN JOAQUIN COUNTY AND STATE OF <br /> CALIFORNIA, LOCATED ON THE WEST SIDE OF LAMMERS ROAD, <br /> 2,700 FEET SOUTH OF SCHULTE ROAD. (DISTRICT 5). <br /> APPLICANT: Jepsen-Webb Ranch LLC APN: 209-240-11 <br /> INFORMATION: <br /> The site is not currently located within a Federal Flood Insurance Administration Designated <br /> Flood Hazard Area. <br /> RECOMMENDATIONS: <br /> 1. An Encroachment Permit shall be required for work within road right-of-way. <br /> (Development Title Sections 9-1145.4 and 9-1145.5) <br /> 2. The driveway approach shall be improved in accordance with the requirements of <br /> San Joaquin County Standards R-17 prior to issuance of the occupancy permit. <br /> (Development Title Section 9-1145.5) <br /> 3. The Traffic Impact Mitigation Fee will be required for this development. The fee is due <br /> and payable at the time of building permit application. (The fee currently is $182.19 per <br /> daily trip-end generated in the Tracy area. The fee shall be automatically adjusted <br /> July 1 of each year by the Engineering Construction Cost Index as published by the <br /> Engineering News Record.) <br /> (Resolution R-00-433) <br /> 4. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> GK:BN:mr <br /> PS-1006 1A <br />