My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0007523 SSNL
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
14551
>
2600 - Land Use Program
>
PA-0800372
>
SU0007523 SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:33:07 AM
Creation date
9/6/2019 11:05:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SU0007523
PE
2622
FACILITY_NAME
PA-0800372
STREET_NUMBER
14551
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
RIPON
APN
20306017
ENTERED_DATE
12/29/2008 12:00:00 AM
SITE_LOCATION
14551 E LOUISE AVE
RECEIVED_DATE
12/29/2008 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\L\LOUISE\14551\PA-0800372\SU0007523\SS STDY.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JR2 Page 10 <br /> Consulting, Inc. November 18, 2008 <br /> Environmental- Engineering- Geology Project Number 2008021 <br /> 6. PERCOLATION TEST INFORMATION <br /> Site Map Showing Test Locations <br /> A site map is attached ee P1ate— <br /> Number of Percolation Tests <br /> A total of twopercolation tests where conducted on each proposal parcel for a total of four <br /> percolation tests. <br /> Borehole Preparation and Presoak <br /> Two shallow soil boreholes were advanced on the site with a hand auger on November 18, 2008 <br /> andtwodeep soil boreholes were advanced on the site with a Drill rig on November 18, 2008. <br /> ? 2-inch diameter PVC pipe with perforations on the bottom was used to measure the drop of <br /> water in the percolation test boring. Approximately 2 inches of"coarse sand" were placed in the <br /> bottom of the open soil borehole, then the PVC pipe was installed on top of the sand. "sand" <br /> i <br /> was then used to backfill in the annular space. <br /> Presaturation of the percolation test holes occurred 24 hours before each percolation test. The <br /> depth of water used to pre-soak was 12 inches above the bottom of the borehole. <br /> Condition of the test holes after pre-soak <br /> After the 24 hour pre-soak,the boreholes appeared dry and intact on November 19, 2008. <br /> JR SQUARED CONSULTING,INC. ENVIRONMENTAL-ENGINEERING•GEOLOGY <br /> ` 6532 MCNEIL COURT,VALLEY SPRINGS,CA 95252 PHONE(209)772.3841 -FAX(209)740-4303 <br />
The URL can be used to link to this page
Your browser does not support the video tag.