Laserfiche WebLink
(4) Phase 3 will consist of the following: <br /> A- Building"C", a 5,000-square-foot store. <br /> B. A wholesale nursery <br /> c. STORM DRAINAGE: Any additional storm water drainage created by new improvements shall be <br /> retained on the site. The drainage pattern and corresponding storm drain improvements shall be <br /> shown on the Site Plan. Drainage calculations prepared by a registered civil engineer or architect <br /> shall be included. (Development Title Section 9-1135) <br /> d. PARKING: Off-street parking shall be provided and comply with the following. <br /> (1) All parking spaces, driveways, and maneuvering areas shall be surfaced and <br /> ermanently <br /> maintained with base material of appropriate depth and asphalt concrete or Portland cement <br /> concrete to provide a durable, dust-free surface. Bumper guards shall be provided where <br /> necessary to protect adjacent structures or properties. (Development Title Section 9-1015.5[e]) <br /> (2) A minimum of 20 additional parking spaces shall be provided, including one accessible space. <br /> which shall be van accessible. Ten spaces shall be required to be provided during Phase 1- the <br /> remaining ten spaces shall be provided as part of Phase 3be located <br /> every 1,000 feet of building area. <br /> as close as possible to the primary entrance (C.C.R., Title 24). (Two spaces are required for. Accessible spaces shall <br /> 0.67 spaces are required for every employee.) (Development <br /> Title Section 9-1015.3) <br /> (3) Display areas and unloading and preparation areas shall be surfaced with a minimum of four <br /> inches of aggregate base. <br /> e. LIGHTING: Lighting shall be provided and comply with the following: <br /> (1) If the parking area is to be used at night, parking lot and security lighting shall be installed <br /> (Development Title Section 9-1015.5[g]) <br /> (2) Any lighting shall be designed to confine direct rays to the premises. No spillover beyond the <br /> Property lines shall be permitted except onto public thoroughfares, provided, however, that such <br /> light shall not cause a hazard to motorists. (Development Title Section 9-1015.5[g][41) <br /> f- LANDSCAPING: Landscaping shall be provided and comply with the following: <br /> (1) A minimum ten (10) foot wide landscaped strip, respecting the ultimate right-of-way width of <br /> Highway 205, shall be installed across the frontage of the project site. (Development Title <br /> Section 9-1020.7) <br /> (2) All areas not used for buildings, parking, driveways, walkwa s, approved <br /> areas, or other permanent facilities shall be landscaped. (Development TitletSectiondoor o9-ge <br /> 1020.7) <br /> (3) Areas of the property which are not part of the project shall be barricaded from traffic and kept <br /> mowed and dust free. <br /> P <br /> g. SCREENING: Screening shall be provided and comply with the following: <br /> (1) All storage materials and related activities, including storage areas for trash, shall be screened <br /> so as not to be visible from adjacent properties and public rights-of-way. Screening shall be six <br /> Conditions of Approval <br /> -2 - <br /> SA-01-87 <br />