Laserfiche WebLink
(3) 'Provide parking for the physically disabled. The space(s) shall be located as close as possible <br /> to the pilVary entrance. (C-C.R.,Title 24). <br /> (4) Provide:;identification signs for.the parking space(s) including the "tow away" sign at each <br /> entrance`or visible from each space (C.C.R., Title 24)_ <br /> (5) The slop of a parking space shall not exceed %inch per foot(C.C.R.,Title 24). <br /> (6) Provide one van parking space. <br /> s. <br /> (7) Provide festrooms conforming with all disabled access requirements (C.C.R., Title 24) Uniform <br /> Plumbing Code,Table 4-1. <br /> (8) Engineered plans required for occupancy change accessible restrooms and parking. <br /> 2. DEPARTMENT OF PUBLIC WORKS (Staff Contact: Bill Dubois, 468-3000) <br /> a. An encroachment permit shall be required for all work within the road right-of-way. Note: Driveway <br /> encroachment permits are for flatwork only. All vertical features, including but not limited to fences, <br /> walls, private light standards, rocks, landscaping, and cobbles, are not allowed in the right-of-way. <br /> 4 (Development Title Sections 9-1145.4 and 9-1145.5) <br /> b. The drivewaT approach shall be improved in accordance with the requirements of San Joaquin <br /> County Standards R-17 prior to issuance of the occupancy permit. (Development Title Section 9- <br /> 1145.5) <br /> c. Gates are not permitted in the driveway within 60 feet of the centerline of Peltier Road. <br /> d. The site shall be designed to contain the storm water runoff on the site and to prevent off-site <br /> sediment transport. Provide drainage facilities and meet the requirements of San Joaquin County <br /> Development Standards to prevent the increased runoff release rate of storm water from discharging <br /> onto other properties. Retention basins shall be fenced with six-foot-high chain-link fence or equal <br /> when the maximum design depth is 18 inches or more. Required retention basin capacity shall be <br /> calculated bya registered civil engineer, licensed contractor, or licensed architect prior to the release <br /> of building permits. (Development Title Section 9-1135) <br /> e. A copy of theiFinal Site Pian shall be submitted prior to the release of building permits. <br /> f. Verification shall be obtained from the Solid Waste Division (468-3066)that this development has <br /> met the requirements of the Waste Plan Format for Development Project, The Final Site Plan is <br /> required upoia submittal of verification. <br /> NOTES.- <br /> (1) <br /> OTES:(1) This property is subject to the requirements of San Joaquin County Mosquito and Vector Control <br /> District(209-982-4675)and the California Health and Safety Code for the prevention of <br /> mosquitpes. Best Management Practices guidelines for storm water devices, ponds, and <br /> wetlands-are available. <br /> Conditions of Approval -3- PA-0900273 <br />