Laserfiche WebLink
b. Connect to an approved public water supply system as required by Development Tile <br /> Section 9-1120.2. Prior to issuance of building permits, a letter from the water supplier <br /> will be required which states that they have the capacity to serve the development and <br /> that the system meets State standards. (Development Title Section 9-1100.3) <br /> 4. SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT: (Staff Contact: David <br /> J. Stagnero, 545-7000) <br /> a. The project shall comply with the provisions of the District's Regulation VIII regarding <br /> Fugitive Dust Prohibitions. <br /> b. The project shall comply with the District's Rules 8060 (Paved and Unpaved Roads) and <br /> 8070 (Parking). <br /> c• The project shall take all feasible measures to reduce the amount of ozone precursors <br /> and oxides of nitrogen that will result from the construction of this project. <br /> 5. PACIFIC GAS & ELECTRIC: (Staff Contact: Michael Gunby, 942-1650) <br /> a. Adequate clearances shall be maintained from PG&E's 12 kv electrical distribution <br /> facilities on the southern boundary and along the street frontage of the site. (C.P.U.C., <br /> G.0. 95) <br />