Laserfiche WebLink
(4) Provide restrooms that comply with all disabled access requirements <br /> (5) The continued use of the "Hotel' as retail sales and an apartment shall require the building to <br /> be brought to current code, which includes a structural analysis, occupancy separation, and <br /> disabled access <br /> (6) When the existing storage area attached to the "Show Boat' is converted to a museum, all <br /> current code requirements shall be met. If converted to a museum: the building would <br /> exceed the allowable area and would have to be fire-sprinklers or divided by area separation <br /> walls. <br /> (7) An inspection will be required of the "Stage Line" building to determine the structural <br /> adequacy and proper classification. <br /> (8) The gazebo that was built without permits is structurally inadequate and must be removed or <br /> repaired with the appropriate plans submitted. <br /> (9) Buildings east of the ghost town shall be removed or comply with all code requirements for <br /> the proposed use. <br /> i. FIRE MARSHAL: The following Uniform Fire Code and San Joaquin County Ordinance <br /> requirements will be applicable and shall be incorporated in the construction plans before <br /> submittal to the Building Inspection Division: <br /> (1) Provide material approved by the State Fire Marshal for the canopy over the concrete slab <br /> next to the gazebo. If the canopy is made permanent, a building permit is required, if it is <br /> temporary, a fire permit is required (temporary use is only allowed for 180 days out of a 12- <br /> month period). <br /> (2) Rubbish, tree trimmings and debris shall be removed. Combustible vegetation shall be <br /> maintained at a height of no more than four inches. <br /> (3) Fire extinguishers shall be serviced annually and spaced so that travel distance is not greater <br /> than 75 feet (2A1 OBC minimum). <br /> 2. DEPARTMENT OF PUBLIC WORKS (Staff Contact: Gabriel Karam, 468-3000) <br /> a An encroachment permit shall be required for work within the road right-of-way. (Development <br /> Title Sections 9-1145.4 and 9-1145.5) <br /> b. The driveway approach, unless already paved, shall be improved in accordance with the <br /> requirements of San Joaquin County Standard R-17 prior to issuance of the occupancy permit. <br /> (Development Title Section 9-1145.5) <br /> c. The Traffic Impact Mitigation Fee may be required for this development. The fee is due and <br /> payable at the time of Final Site Plan approval. The fee currently is $167.69 per additional daily <br /> trip-end generated in the Stockton area. The fee shall be automatically July 1 of each year by the <br /> Engineering Construction Cost Index as published by the Engineering News Record. (Resolution <br /> R-96-592) <br /> d. A copy of the Final Site Plan shall be submitted prior to the release of building permits. <br /> Conditions of Approval - 4 - UP-00-8 <br />