My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0002294
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
18915
>
2600 - Land Use Program
>
UP-95-16
>
SU0002294
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:58:42 PM
Creation date
9/8/2019 12:54:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0002294
PE
2626
FACILITY_NAME
UP-95-16
STREET_NUMBER
18915
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
ENTERED_DATE
10/26/2001 12:00:00 AM
SITE_LOCATION
18915 N HWY 99
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\18915\UP-95-16\SU0002294\APPL.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Development Committee -2- <br /> Unless otherwise specified, all Conditions of Approval and <br /> ordinance requirements shall be fulfilled prior to the <br /> establishment of the use and the issuance of any building permits. <br /> Those Conditions followed by a Section Number have been identified <br /> as ordinance requirements pertinent to this application. Ordinance <br /> requirements cannot be modified, and other ordinance requirements <br /> may apply. <br /> Conditions of Approval: <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT (Staff Contact: Richard <br /> Larrouy, 468-3142) : <br /> a. APPROVED USE. This approval shall be to establish a <br /> church facility in two phases, as described below: <br /> PHASE 1: construction of a 30, 000-square foot structure <br /> for a 500-seat worship and education center; and <br /> PHASE 2 : construction of a 20, 000-square-foot, two story <br /> recreation, education, and office building, with an <br /> expansion of the Phase 1 building to 990 seats. <br /> b. BUILDING PERMIT. Submit "Commercial Building Permit <br /> Applications" for the approved structures. The Site Plan <br /> required as a part of the building permit may be phased <br /> and must be prepared by a registered civil engineer or <br /> licensed architect. This Plan must show drainage, <br /> driveway access details (including gates) , on-site <br /> parking, landscaping, signs, existing and proposed <br /> utility services, and grading (refer to the "SITE PLAN <br /> CHECK LIST" for details) . A fee is required for the Site <br /> Plan review. (Development Title Section 9-884) <br /> C. STORM DRAINAGE. Stormwater drainage shall be retained <br /> on-site. The drainage pattern and corresponding storm <br /> drain improvements shall be shown on the Site Plan. <br /> Drainage calculations prepared by a registered civil <br /> engineer shall be included. <br /> d. PARKING and SURFACING. Off-street parking shall be <br /> provided and comply with the following: <br /> (1) All parking spaces, driveways, and maneuvering <br /> areas shall be surfaced and permanently maintained <br /> with base material of appropriate depth and asphalt <br /> concrete or Portland cement concrete to provide a <br /> durable, dust-free surface. (Development Title <br /> Section 9-1015 . 5) <br />
The URL can be used to link to this page
Your browser does not support the video tag.