Laserfiche WebLink
-3- <br /> Kerry Sullivan <br /> COMMENTS ON DEVELOPMENTS <br /> PA-03-462 (SU) <br /> 8. A Preliminary Soils Report is required in accordance with the County Standards for the <br /> purpose of determining the R-Value for the design of the roads. <br /> (Development Title Section 9-910.2) <br /> 9. All utilities shall be underground except power transmission facilities of a 35 KV or <br /> greater. Public utility easements shall be provided along the road frontage of the <br /> subdivision and as required by the public utility companies. <br /> (Development Title Section 9-1155.2) <br /> 10. A grading plan shall be submitted and approved prior to approval of the Final Map. The <br /> grading plan shall contain the information listed in the U.B.C., Appendix, Chapter 33, <br /> Section 3309, complete drainage details and elevations of adjacent parcels. Retaining wall <br /> details shall be submitted where applicable. Grading in excess of 5,000 cubic yards shall <br /> comply with Sections 3309.3 and 3309.4 for "Engineered Grading Requirements." <br /> (Grading that disturbs more than five acres will require a National Pollutant Discharge <br /> Elimination System permit.) <br /> 11. The subdivider shall agree to and shall pay user fees for the utility services from the time <br /> improvements are accepted by the County until the lots are placed on the County tax rolls, <br /> or up to an eighteen-month period, as the case may be. <br /> (Subdivision Map Act Section 66493) <br /> 12. All traffic signs and markings shall conform to the Manual on Uniform Traffic Control <br /> Devices and San Joaquin County Standards and shall be shown on the improvement plans. <br /> (Development Title Section 9-1150.2) <br /> 13. This area has been subject to historic flooding. Therefore, prior to recording the Final <br /> Map, a note shall be added to the Final Map which specifies that all structures and/or <br /> substantial improvements constructed on parcels one (1) through sixteen (16) shall be <br /> elevated a minimum of 2-feet above the highest grade adjacent to the structures. <br /> 14. State Notice of Intent (NOI) for General Storm Water Construction Permit shall be <br /> required. <br /> NOTE: Any construction activity that results in the disturbance of at least one (1) acre of soil <br /> shall require a State NPDES construction permit. <br /> DTP: <br /> PACOMMENiS\SUAYR 2003\PA-03 462.wpd <br />