My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0007300
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
RIVER
>
26292
>
2600 - Land Use Program
>
QX-89-0002
>
SU0007300
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2020 3:08:38 PM
Creation date
9/9/2019 9:06:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0007300
PE
2656
FACILITY_NAME
QX-89-0002
STREET_NUMBER
26292
Direction
E
STREET_NAME
RIVER
STREET_TYPE
RD
City
ESCALON
APN
24722019
ENTERED_DATE
7/29/2008 12:00:00 AM
SITE_LOCATION
26292 E RIVER RD
RECEIVED_DATE
7/28/2008 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\R\RIVER\26292\QX-890002\SU0007300\CORRESPOND.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
629
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Munn&Perkins Quarry Excavation Permit <br /> Distinctive Environmental Characteristics <br /> The following summarizes potential impacts of the"No Project"alternative and compares them <br /> to the impacts of the proposed project: <br /> Visual and Lighting <br /> Under the No Project Alternative,no physical change would occur at the project site and potential <br /> visual impacts related to additional safety lighting would be avoided. <br /> a <br /> Traffic and Circulation <br /> Under the No Project Alternative, local traffic conditions would remain the same to those <br /> experienced at the current time. Project related truck traffic would be limited to the hours of 5 <br /> a.m. to 9 p.m. and traffic related impacts from 9 p.m. to 5 a.m. would be avoided. <br /> Air Quality and Climate Change <br /> Under the No Project Alternative,air emissions from the existing operation,including haul trucks, <br /> would be the same as those experienced at the current time.Nighttime concerns,regarding potential <br /> odor effects would be avoided,but normal operations including production of rubberized and non- <br /> rubberized asphalt would continue during the day. <br /> Noise <br /> Under the No Project Alternative,there would be no new nighttime noise sources in the vicinity of <br /> the project site. Existing on-site and off-site noise sources during the hours of 5 a.m. to 9 p.m. <br /> would continue. <br /> 4.2.2 Alternative 2 — West Only Haul Route Altemative <br /> Description <br /> This alternative would require all nighttime truck traffic to enter and exit the facility via westbound. <br /> E. River Road. Trucks would be required to utilize McHenry Avenue in order to reach E.River <br /> Road. This haul route reduces the significance of noise related impacts to sensitive residential <br /> receptors located east of the project site entrance along E.River Road.However,residences west of <br /> the project site entrance along E.River Road would still experience noise related impacts during <br /> nighttime operations. <br /> Distinctive Environmental Characteristics <br /> The following summarizes potential impacts of the west only haul route alternative and compares - <br /> them to the impacts of the proposed project: <br /> Visual and Lighting <br /> The west only haul route alternative would result in the same impacts(less than significant)to <br /> visual resources as the proposed project. <br /> Munn&Perkins Quarry Excavation Permit 4-4 ESA f 211086 <br /> Draft EIR April 2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.