4.Alternatives <br /> t^� <br /> Traffic and Circulation <br /> As noted above,under this alternative all nighttime truck traffic would be required to enter and <br /> exit the Munn& Perkins facility via westbound E. River Road.As the traffic analysis in the EIR <br /> assumes that all project traffic could potentially use either the east or west haul route,the potential <br /> F traffic impacts of the West Only Haul Route would be'the same as the proposed project for E.River <br /> Road and McHenry Avenue.However,in order to serve projects located east of the plant,haul trucks <br /> Would need to use an easterlyconnector such as Highway 219/Claribel Road. This increase would <br /> not necessarily be significant, given the lower traffic levels experienced at night in the area. <br /> R' <br /> Air Quality and Climate Change <br />` Impacts to air quality may occur under this alternative due to potentially increased haul distances to <br /> serve easterly projects(see traffic discussion above).Delivering material to the east would require <br /> increased haul distances,resulting in increased criteria pollutanis and greenhouse gas emissions.These <br /> increases are not necessarily significant,but would represent an increase over the proposed project. <br /> �► Noise <br /> As noted above,this alternative would reduce noise related impacts to sensitive residential al receptors <br /> located east of the project site entrance along E. River Road. However, residences west of the <br /> project site entrance along E. River Road would still experience noise related impacts during <br /> �= nighttime operations.Therefore,the overall.number of receptors would be reduced,but the remaining <br /> westerly receptors will still be impacted. Additionally,the westerly receptors could experience <br /> an increase in the number of nights with extended operating hours, as haul trucks headed to the <br /> -� east would still have to pass by on their way to McHenry Avenue. <br /> 4.2.3 Alternative 3 — East Only Haul Route Alternative <br /> Description <br /> ,- This alternative would require all nighttime truck traffic to enter and exit the facility via eastbound <br /> E.River Road.Trucks would be required to utilize Santa Fe Road in order to reach E.River Road. <br /> This haul route reduces the significance of noise related impacts to sensitive residential receptors <br /> located west of the project site entrance along E.-River Road. However, residences east of the <br /> project site entrance along E. River Road would still experience noise related impacts during <br /> nighttime operations. <br /> Distinctive Environmental Characteristics <br /> The following summarizes potential impacts of the east only haul route alternative and compares <br /> them to the impacts of the proposed project: <br /> L Visual and Lighting <br /> The east only haul route alternative would result in the same impacts(less than significant)to <br /> l visual resources as the proposed project. <br /> t <br /> Munn&Perkins Quarry Excavation Permit - -rJ - ESA 7211086 <br /> Draft EIR - - April 2011 -_ <br />