Laserfiche WebLink
-NM=&Perkins Quarry Excmalian Permit <br /> Additionally. C ',0A Guidelines Scohn 151146 6 requires consideration of alternatives that could <br /> avid or substantially lessen any sibni% nt adverse- en dronmental effect~ of Me pniposed <br /> project, including alternatives thirt MaN be more costh or Could otherwise impede the projzct's <br /> of}�cctivcs. f lte range of alternatives consid:red must include those: that offer substantial <br /> enr imnunental advantages mer the proposed project and may he feasibly accomplished in it <br /> successful manner conside ring economic. environmental. social. technological. and l gal f,€ctors. <br /> The Uhwhg alterr MA cs ane discussed in (Impor 4, Alternatives: <br /> • Altcrnativ 1 — No Pr(*ct Altcrnativc <br /> • Alternatiie 2 Wes (_)nlv I lain Ronte Alternaiive <br /> • Alternative _) 1:;,3st 0111V Haul Route Alternative <br /> Ahamarive ? (West C)nh° Haul Route) is designated in the I=.IR as the environn1entally superior <br /> =rltcrnative. <br /> Summary of Environmental Impacts <br /> lable. FS-1 pments a su mmy ofprejjcct imptcl and praposed miligation n€Ca ores that �vonld <br /> further avoid or ininirnire potential impacts. It also indicates the level ofsignificance ofeach <br /> environmental irrapact both before and after the application of the recommended mitigation <br /> measure(s). <br /> For detailed discussions of all project impacts and mitigation measures_ see Chapter- 3_ <br /> `°I'rtvironmenta.l Setting. Impacts, and Mhigatki Measures:' <br /> M,:=&Pgr6 w Own Nw,,,a.��,n Pe,x:' � ESA 72110$8 <br /> 2A 1 <br />