Laserfiche WebLink
Executive Summary <br /> TABLE ES-1 <br /> SUMMARY OF ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES <br /> Level of Significance Level of Significance <br /> Environmental Impact before Mitigation Mitigation Measures after Mitigation <br /> 3.1. Visual and Lighting <br /> 3.1.1: Implementation of the project has the potential to Potentially significant 3.1.1:Ail outdoor lighting will be required to be fully shielded and shall adhere to Section Less than significant <br /> create a new source of substantial light or glare which 9-1025.6 of the Development Code in order to minimize any impacts resulting from <br /> would adversely affect day or nighttime views in the outdoor lighting on adjacent properties. <br /> area. <br /> 3.2. Transportation and Traffic <br /> 3.2,1: The Project would increase traffic volumes on Less than significant None required Less than significant <br /> area roadways. <br /> 3.3. Air Quality and Climate Change <br /> 3.3.1: The project could create objectionable odors Potentially significant 3.3.1: The operator shall incorporate additives to the rubberized asphalt mix in Significant and Unavoidable <br /> affecting a substantial number of people. accordance with accepted industry standards. The objective of the additives shall be to <br /> reduce offensive odors associated with the production of rubberized asphalt. The <br /> operator shall consider technological improvements to reduce odors, as they become <br /> available,and incorporate if feasible. <br /> 3.3.2: Project operation would not create objectionable Less than significant None required Less than significant <br /> odors affecting a substantial number of people. <br /> 3.4.Noise <br /> 3.4.1:Project asphalt plant operations would add to the Less than significant None required Less than significant <br /> noise environment in the project vicinity. <br /> 3.4.2: Off-site project haul truck traffic would add to Potentially significant 3.4.1: All project trucks shall be operated using noise-mitigating operating parameters Significant and Unavoidable <br /> the noise environment in the project vicinity. when entering or leaving the plant on East River Road. Based on testing conducted by <br /> Ballard Acoustical Consultant, Inc..the quietest haul truck operating parameters were as <br /> follows. <br /> • Empty Trucks: Travel speed at 38113 mph with engines in 8'"gear at 700-800 <br /> rpm <br /> • Loaded Trucks: Travel speed of 33-35 mph with engines in 5" or 7"gear <br /> at 1,400-1,600 rpm <br /> Furthermore,truck parking anywhere along River Road and the use of jake brakes at the <br /> McHenry Ave/E. River Road intersection and the E. River Roadlproject driveway is <br /> prohibited. The applicant shall monitor full time for compliance with these requirements <br /> beginning 30 minutes prior to any approved extended hour operations. <br /> -- <br /> ---- ---- <br /> Munn&Peri ins Quarry Excavation PF mit ES-3 FSA 7 21'CBC <br /> Final Envsonmental lmpac!Roper; SepYmhe,201" <br />