Laserfiche WebLink
Chandler Martin -4- <br /> COMMENTS ON DEVELOPMENTS <br /> PA-07-055 (SU) <br /> 21. Construction sites that result in soil disturbance of one acre or greater will require the preparation and <br /> implementation of a Storm Water Pollution Prevention Plan(SWPPP) meeting the requirements of the <br /> State Water Resources Control Board(SWRCB) Order No. 99-08-DWQ, Waste Discharge <br /> Requirements (WDRs) for Discharges of Stormwater Runoff Associated with Construction Activity <br /> (General Permit). <br /> 22. The proposed project is classified as a Priority Project in the County Phase I National Pollutant <br /> Discharge Elimination Permit and must comply with the County Water Quality Control Criteria Plan <br /> by filtering, treating or infiltrating the 85'percentile storm. County Stormwater Fees are applicable. <br /> MRC:DG:av <br /> P\COMMENCS\SU\YR 2007\PA-0700055-PRE.wpd <br />