My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004190
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SHAW
>
881
>
2600 - Land Use Program
>
PA-0400058
>
SU0004190
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:30:32 AM
Creation date
9/9/2019 10:14:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004190
PE
2632
FACILITY_NAME
PA-0400058
STREET_NUMBER
881
Direction
N
STREET_NAME
SHAW
STREET_TYPE
RD
City
STOCKTON
ENTERED_DATE
5/14/2004 12:00:00 AM
SITE_LOCATION
881 N SHAW RD
RECEIVED_DATE
2/20/2004 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\S\SHAW\881\PA-0400058\SU0004190\APPL.PDF \MIGRATIONS\S\SHAW\881\PA-0400058\SU0004190\CDD OK.PDF \MIGRATIONS\S\SHAW\881\PA-0400058\SU0004190\EH COND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kerry Sullivan <br /> COMMUNITY DEVELOPMENT <br /> PA-04-58 (SA) <br /> 3. The Traffic Impact Mitigation Fee may be required for this development. The fee is due and payable at <br /> the time of building permit application. (The fee currently is$721.00 per 1,000 gross square foot of <br /> building designated as Manufacturing in the Stockton area. The fee shall be automatically adjusted July 1 <br /> of each year by the Engineering Construction Cost Index as published by the Engineering News <br /> Record.) (Resolutions 00-433) <br /> 4. The Water Supply Facilities Impact Mitigation Fee may be required for this development. The fee is due <br /> and payable prior to issuance of the building permit. (The fee currently is$212.00 per 1,000 gross <br /> square foot of building designated as Manufacturing. The fee shall be automatically increased on <br /> January 1 of each year through the year 2005 at the rate of 7.66 percent.) <br /> (Development Title Section 9-818.4 and Resolutions R-91-327,R-94-185 and R-97-5) <br /> 5. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 6. Verification shall be obtained from the Solid Waste Division(468-3066) that this development has met <br /> the requirements of the Waste Plan Format for Development Projects. Final Site Plan is required upon <br /> submittal of verification. <br /> NOTE: Any construction activity that results in the disturbance of at least one(1)acre of soil shall <br /> require a State NPDES construction permit. <br /> DTP:DG:ar <br /> PACOMMENTSLSA\YR 2004TA-0400058.wpd <br />
The URL can be used to link to this page
Your browser does not support the video tag.