Laserfiche WebLink
Kerry Sullivan 2 <br /> COMMENTS ON DEVELOPMENT <br /> PA-0300561 (SA) <br /> 4. The Water Supply Facilities Impact Mitigation Fee will be required for this development. The <br /> fee is due and payable prior to issuance of the building permit. (The fee currently is$528.00 per <br /> 1,000 gross square foot of building designated as Service Commercial. The fee shall be <br /> automatically increased on January 1 of each year through the year 2005 at the rate of 7.66 <br /> percent. A credit may be allowed if it can be verified that the existing development on this site <br /> was in operation on or after April 30, 1991.) <br /> (Development Title Section 9-818.4 and Resolutions R-91-327,R-94-185 and R-97-5) <br /> 5. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 6. Verification shall be obtained from the Solid Waste Division(468-3066)that this development <br /> has met the requirements of the Waste Plan Format for Development Projects. Final Site Plan is <br /> required upon submittal of verification. <br /> 7. All new structures or substantial improvements constructed on the parcel shall be elevated a <br /> minimum of one (1)above the 100-year flood elevation of 27-feet. <br /> 8. A State National Pollutant Discharge Elimination System(NPDES)Construction Permit Notice <br /> of Intent(NOI) shall be filed with the State Water Resources Control Board if over on(1) acre of <br /> total ground is disturbed. Additionally, a Storm Water Pollution Prevention Plan shall be <br /> submitted to the County for approval. <br /> 9. All traveled areas (less than 28-feet in width) adjacent any building, curbing, or walkway should <br /> be posted"No Parking"and "Fire Lane"pursuant to City of Stockton Standard Drawing No. <br /> 41A. This applies specifically along the northeast line of the proposed. (City of Stockton) <br /> DTP:DG:ar <br /> PXOMMENTSISA\YR 2003\PA-0300561.doc <br />