My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0002217
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
14749
>
2600 - Land Use Program
>
UP-99-13
>
SU0002217
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2022 4:19:56 PM
Creation date
9/9/2019 10:35:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0002217
PE
2626
FACILITY_NAME
UP-99-13
STREET_NUMBER
14749
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
Zip
95240
ENTERED_DATE
10/26/2001 12:00:00 AM
SITE_LOCATION
14749 N THORNTON RD
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\T\THORNTON\14749\UP-99-13\SU0002217\APPL.PDF \MIGRATIONS\T\THORNTON\14749\UP-99-13\SU0002217\CDD OK.PDF \MIGRATIONS\T\THORNTON\14749\UP-99-13\SU0002217\EH COND.PDF \MIGRATIONS\T\THORNTON\14749\UP-99-13\SU0002217\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14 � <br /> �R <br /> r <br /> - 3 - <br /> Rocky's Restaurant September 4, 1984 <br /> Attn: Mr. Rocco Benigno <br /> E <br /> Subject: Septic System and Filter Bed For <br /> Rocky's Restaurant <br />' Assuming that fifty (50X) percent of your estimated 500 customers <br /> per day utilize the restroom and your present fixtures use six (6) to <br />} seven (7) gallons per flush, we estimate that the installation of "low <br /> flow" type fixtures utilizing approximately three (3) gallons per flush <br /> would save you approximately 750 gallons per day. <br /> In discussing sewage disposal in the area with Mr. Terry Piazza, of <br /> the Consulting Civil Engineering firm of Baumback & Piazza in Lodi, <br /> Engineers for the Saddle City project immediately to your west, he <br />{ indicated that they at times also have problems with their septic <br />' system. They are in the process of having designed for them a package <br /> sewage treatment plant to serve their project. As a long-range solution <br /> i to your problem, we strongly recommend that you contact Mr. Herman <br /> Hance, of Gibraltar Builders, the developers of the project, to discuss <br /> the possibilities of tying in with their package treatment plant. His <br /> phone number in Stockton is 951-7191. Mr. Piazza indicates they expect <br /> the plant to be operating by summer 1985. <br /> We prepared the above only as possible temporary solutions and <br /> offer no guarantee that they will give you any long-range solution to <br /> your problem. The area, with its high water table, will continue to <br /> cause problems, especially in periods of heavy rain or during periods <br /> whereby you utilize more water than your system can handle. <br /> r <br /> Should you wish to discuss this matter further, please do not <br /> hesitate to contact Mr. Stephen Thumlert of this office. <br /> Very truly yours, <br /> R. W. SIEGFRIED & ASSOCIATES <br /> i <br /> BY <br /> R. W. SieV;r-J d <br /> SRT/lu <br /> cc: Robert Lloyd, Attorney <br /> E <br /> E <br />
The URL can be used to link to this page
Your browser does not support the video tag.