My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0002230
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
1973
>
2600 - Land Use Program
>
UP-98-03
>
SU0002230
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:29:07 AM
Creation date
9/9/2019 10:46:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0002230
PE
2626
FACILITY_NAME
UP-98-03
STREET_NUMBER
1973
Direction
W
STREET_NAME
TURNER
STREET_TYPE
RD
City
LODI
Zip
95240
ENTERED_DATE
10/26/2001 12:00:00 AM
SITE_LOCATION
1973 W TURNER RD
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\T\TURNER\1973\UP-98-03\SU0002230\APPL.PDF \MIGRATIONS\T\TURNER\1973\UP-98-03\SU0002230\CDD OK.PDF \MIGRATIONS\T\TURNER\1973\UP-98-03\SU0002230\EH COND.PDF \MIGRATIONS\T\TURNER\1973\UP-98-03\SU0002230\EH PERM.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
301
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Wastewater Treatment System *awl FALL CREEK <br /> Engineering Report ENGINEERING,INC. <br /> Average Rainfall Year(928 Ton Crush) High Rainfall Year(928 Ton Crush) <br /> 5,000 ----.__- ■Stormt+ater 9.000 ................ ... .........I m Stormwater <br /> 4,500 - a Process WW 8,000 <br /> 9 <br /> 4,000 - - - Q 7,000 <br /> Z 3,500 — ::' 6,000 <br /> a 3,000 -- 0 5,000 -- --- <br /> 2,500 - <br /> 2,000 d 4,000 <br /> E°- I S 3.000 - <br /> E ],Soo — E <br /> �j 1,000 U 2,000 - <br /> Soo - 1,000 - <br /> � n Feb Mar A r May Jun Jul Aug Se Oct Nov Dec Jan Feb Mar Apr May Jun Jul AugAu¢ Sep Oct Nov Dec IP Y P <br /> - Month Month <br /> 1111" Figure 2.2. Jessie's Winery Monthly Combined Flows— 10-Year Plan <br /> %r <br /> `, 2.3. Daily Organic Load <br /> A calculation was performed to determine the daily organic load in the wastewater based on an <br /> assumed peak organic load, BOD concentration of 5,000 mg/L, and average daily process water <br /> flows during September, the peak month of crush. The peak load was estimated as follows: <br /> Current: 1,660 gpd x 5,000 mg/L of BODS x 8.34E-6 = 69 lbs BODS/day <br /> %W 10 Year: 3,940 gpd x 5,000 mg/L of BODS x 8.34E-6 = 164 lbs BODS/day <br /> .t. <br /> .. <br /> taw <br /> .. <br /> .. <br /> ]ESSIE'S GROVE WINERY MAY 2002 <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.