Laserfiche WebLink
In addition to the basketball games,the multi-purpose room will be used for major dinners and <br /> special events. These events will occur on Friday or Saturday evenings, and there will be <br /> approximately 5 per year. The average attendance at these events will be approximately 500, <br /> and will generate approximately 250 vehicles. <br /> Campus-Wide Events <br /> The annual Fall Festival will move from the Eaton Campus to the Valpico Campus. This parish <br /> fundraising event involves all aspects of the parish community. It is a three day event in <br /> September(Friday night, Saturday, and Sunday), including a carnival, dinners, and an auction, in <br /> addition to the typical Saturday and Sunday mass schedule. Over the entire three day event, <br /> attendance will be approximately 2000. <br /> Phase 1 <br /> Phase 1 will be the multi-purpose room, and it will be built immediately. It will be used for <br /> masses, basketball gamma I and special events. There will be a seating capacity of 800 for masses, <br /> and 500 for dinners. l <br /> There will be two evening masses on Saturdays, between 5 pm and 7 pm, with an average <br /> attendance of 700. There will be three masses on Sundays between 7 am and 12 pm, with an <br /> average attendance of 700. There will be two additional masses for special celebrations on <br /> Christmas and Easter. Masses will be scheduled so cars leaving one mass do not conflict with <br /> cars arriving for the next mass. <br /> We anticipate only very large funerals will occur, maybe once or twice per year, and no <br /> weddings. <br /> The sports schedule would be implemented, as described above. <br /> The Fall Festival will be moved to the Valpico Campus upon completion of phase 1. <br /> Additional Phases <br /> The remaining phases are described in the attached booklet. They are planned to be built over <br /> the next ten years. The exact order and timing of the phases will be based on need and <br /> fundraising. <br /> Utilities <br /> Tr affi c <br /> The applicant has requested the County to conduct a traffic study for the site. As explained <br /> above, much consideration was given to traffic considerations in our design process. We have <br /> minimized the impacts of the school peak by moving all the cueing on site, and the scheduling of <br /> the masses and special events will minimize the traffic impact, recognizing that the impacts will <br /> happen at very off-peak times. The applicant is expecting discussion with the traffic engineer <br /> and public works on limitations on turn movements and tum pockets. The applicant hopes to <br /> defer as many frontage and off-site improvements to later phases as possible. <br /> --� , _ . �- _- s�- ;.r_-�--��--. •v�-^.f--smac.�-�-- <br />