Laserfiche WebLink
n <br /> Conditions - <br /> Use Permit Application No. UP-00-24 was approved by the Planning Commission on The <br /> effective date of approval is . This approval will expire on ,which is 18 months from <br /> t <br /> he <br /> effective date of approval, unless (1) all Conditions of Approval have been complied with, ( ) all <br /> necessary building permits have been issued and remain in force,and (3)all necessary permits from <br /> other agencies have been issued and remain in force. <br /> Unless otherwise specified,all Conditions of Approval and ordinance requirements shall be fulfilled <br /> prior to the establishment of the use and the Issuance of any building permits. Those Conditions <br /> followed by a Section Number have been identified as ordinance requirements pertinent to this <br /> application. Ordinance requirements cannot be modified, and other ordinance requirements may <br /> apply. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT(Staff Contact: Chandler Martin,468-3144) <br /> a. BUILDING PERMIT: Submit an "APPLICATION-COMMERCIAL BUILDING PERMIT." The Site <br /> Plan required as a part of the building permit must be prepared by a registered civil engineer.or <br /> licensed architect This Plan must show drainage,driveway access details(including gates),on-site <br /> parking, landscaping, signs, existing and proposed utility services, and grading (refer to the "SITE <br /> PLAN CHECK LIST' for details). A fee is required for the Site Plan review. (Development Title <br /> Section 9-884) <br /> b. APPROVED USE: This approval is for the expansion of an olive processing facility by the <br /> construction of a detention pond for the storage of process waste water and the construction of a <br /> concrete slab for additional storage tanks,as shown on the site plan dated November 30, 2000(Use <br /> Type: Agricultural Processing,Food Manufacturing). <br /> c. BUSINESS LICENSE: The applicant shall secure an approved Business License prior to the <br /> initiation of the use. The Business License may be applied for concurrently with the building permit <br /> application. (Section 7-1000 of the County Ordinance Code) <br /> d. STORM DRAINAGE: Storm water drainage shall be retained on the site. The drainage pattern and <br /> corresponding storm drain improvements shall be shown on the Site Plan. Drainage calculations <br /> prepared by a registered civil engineer or architect shall be included. (Development Title Section 9- <br /> 1135) <br /> 2. DEPARTMENT OF PUBLIC WORKS Staff Contact: Gabe Karam 468-3000 <br /> a. The Traffic Impact Mitigation Fee may be required for additional trip-ends for this development. <br /> The fee is due and payable at the time of building permit application. The fee currently is <br /> $104.16. The fee shall be automatically adjusted on July 1 of each year by the Engineering <br /> Construction Cost Index as published by the Engineering News Record. A credit may be allowed <br /> if it can be verified that the existing development on this site was in operation on or after April 23, <br /> 1990. (Resolution R-96-592) <br /> b. A copy of the Final Site Plan shall be submitted prior to the release of building permits. <br /> c. Verification shall be obtained from the Solid Waste Division (468-3066)that this development has <br /> addressed the items on the Waste Plan Format for Development Projects. The Final Site Plan is <br /> required upon submittal of verification. <br /> San Joaquin County UP-00-241Studley Company <br /> Community Development Page 5 <br />