Laserfiche WebLink
[ J. <br /> and other ordinance requirements may apply. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT (Staff Contact: Chandler Martin,468-3144) <br /> a. BUILDING PERMIT: Submit an "APPLICATION-COMMERCIAL BUILDING PERMIT".. <br /> E The Site Plan required as a part of the building permit must be prepared by a registered <br /> civil engineer or licensed architect. This Plan must show drainage, driveway access <br /> details including gates, on-site parking, landscaping, signs, existing and proposed utility <br /> services, and grading (refer to the "SITE PLAN CHECK LIST' for details). A fee is <br /> required for the Site Plan review. (Development Title Section 9-884) <br /> b. APPROVED USE: This approval is for the expansion of an olive processing facility by the <br /> construction of a detention pond for the storage of process waste water and the <br /> construction of an additional concrete slab for additional storage tanks as shown on the <br /> site plan dated November 30, 2000. <br /> c. BUSINESS LICENSE: The applicant shall secure an approved Business License prior to <br /> the initiation of the use. The Business License may be applied for concurrently with the <br /> building permit application. (Section 7-1000 of the County Ordinance Code) <br /> d. STORM DRAINAGE: Stormwater drainage shall be retained on-site. The drainage <br /> pattern and corresponding storm drain improvements shall be shown on the Site Plan. <br /> Drainage calculations prepared by a registered civil engineer or architect shall be included. <br /> (Development Title Section 9-1135) <br /> 2. ON-SITE MITIGATION MEASURES.FOR KIT FOX AND BURROWING OWLS: <br /> The following on-site mitigation measures shall be implemented during the construction and <br /> pre-construction period: <br /> a. During pre-construction period project, boundaries shall be staked; protective fencing <br /> shall be provided for vulnerable on-site habitats such as riparian corridors and <br /> nests/burrows; and pre-construction surveys shall be initiated 30 days before planned <br /> construction and shall be conducted prior to each project stage to locate burrowing owl, <br /> kit foxes and kit fox dens; <br /> b. During all construction periods, a biologist shall be made available to provide assistance <br /> and to monitor the successful implementation of these mitigation measures; <br /> c. Any kit fox dens or burrowing owl nests identified within the path of construction shall be <br /> excavated prior to the breed inglnesti ng season under the direct supervision of a wildlife <br /> biologist, subject to Department of Fish and Game and U.S. Fish and Wildlife Service <br /> approval; <br /> d. An endangered species compliance program shall be developed and implemented for <br /> project employees and contractors; this program shall be subject to approval of the <br /> Department of Fish and Game and the County. <br /> E' CM:vb <br /> UP0024 <br />