My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0007786
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
ATKINS
>
18909
>
2600 - Land Use Program
>
PA-0900094
>
SU0007786
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:33:15 AM
Creation date
9/18/2019 9:20:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0007786
PE
2656
FACILITY_NAME
PA-0900094
STREET_NUMBER
18909
Direction
N
STREET_NAME
ATKINS
STREET_TYPE
RD
City
LODI
APN
01914040
ENTERED_DATE
6/26/2009 12:00:00 AM
SITE_LOCATION
18909 N ATKINS RD
RECEIVED_DATE
6/12/2009 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS4\A\ATKINS\18909\PA-0900094\SU0007786\EH COND.PDF \MIGRATIONS4\A\ATKINS\18909\PA-0900094\SU0007786\APPL.PDF \MIGRATIONS4\A\ATKINS\18909\PA-0900094\SU0007786\CDD OK.PDF \MIGRATIONS4\A\ATKINS\18909\PA-0900094\SU0007786\MISC.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b) APPROVED USE: This approval is for a small winery to be constructed in two <br /> phases. Phase One includes the conversion of an existing 1,500 square foot <br /> agricultural building into a wine production building. Phase Two, (building permits <br /> to be issued within five years from the 'effective date of approval), will consist of <br /> converting an existing 1,500 square foot agricultural building and constructing a <br /> 2,750 square foot addition (total of 4,250 square feet) for barrel and case storage. <br /> Phase Two also includes the construction of a 1,500 square foot tasting room. The <br /> winery .,has the capacity to produce a minimum of 201 gallons of wine to a <br /> maximum of 36,000 gallons of wine per year. (Use Type: Winery and Wine <br /> Cellars, Winery, Small) <br /> c) TASTING ROOM: The maximum size of a stand alone wine tasting room or <br /> - structure or area designated for wine tasting within a multipurpose building at an on- <br /> site wine cellar shall not exceed thirty percent (30%) of the area designated for <br /> production facilities or two thousand (2,000) square feet, whichever is greater. <br /> (Development Title Section 9-1075.5(m)(1)(A)) <br /> d) CAPITAL FACILITY FEE: This project may be subject to the Capital Facility Fee. <br /> If the Capital Facility Fee is applicable, the County shall collect the fees before the <br /> issuance of any building permits. (Development Title Section 9-1245.2) <br /> e) STORM DRAINAGE: Any additional storm water drainage created by new <br /> improvements shall be retained on-site. The drainage pattern and corresponding <br /> storm drain improvements shall be shown on the Site Plan.. Drainage calculations <br /> prepared by a registered civil engineer or architect shall be'included. (Development <br /> Title Section 9-1135) <br /> f} PARKING: Off-street parking shall be provided and comply with the following: <br /> 1) All winery driveways and maneuvering areas shall be surfaced and <br /> permanently maintained with base material of appropriate depth and chip <br /> seal to provide a durable, dust free surface. Parking surface material may be <br /> chip seal or alternate material approved by the Director. Bumper guards shall <br /> be provided when necessary. to protect adjacent structures or properties <br /> (Development Title Section 9-1075.6[i]). <br /> 2) A minimum of 4 parking spaces shall be provided, including 1 van accessible <br /> space for Phase One. A minimum of 14 parking spaces shall be provided for <br /> Phase Two: At full buildout, 18 parking spaces shall be provided. Accessible <br /> spaces shall be located as close as possible to the primary entrance (C.C.R., <br /> Title 24). (2.5 parking spaces are required for every 1,000 square feet of <br /> building area). (Development Title Section 9-1015.3) <br /> g) ACCESS AND CIRCULATION: The following requirements apply and shall be <br /> shown on the Site Plan: <br /> 1) Access driveways shall have a width of no less than twenty-five (25) feet for <br /> two-way aisles and sixteen (16) feet for one-way aisles, except that in no case <br /> shall driveways designated as fire department access be less than twenty (20) <br /> feet wide. (Development Title Section 9-1015.5[h][1]) <br /> 4 <br /> incorporated in the construction plans before submittal to the Building Inspection <br /> Division: <br /> 1) The proposed use will change the occupancy from a U occupancy to a F1 <br /> occupancy (U.B.C. Section 3405). The structure must be brought into <br /> compliance with all current code provisions including structural, plumbing, <br /> mechanical, electrical, energy and disabled access requirements. A licensed <br /> architect or registered engineer shall prepare all documents. <br /> 2) Provide parking for the physically disabled. The space(s) shall be located as <br /> close as possible to the primary entrance. (C.C.R., Title 24). <br /> (a) Provide identification signs for the parking space(s) including the "tow away" <br /> sign at each entrance or visible from each space (C.C.R., Title 24). <br /> (b) The slope of a parking space shall not exceed Y4 inch per foot (C.C.R., Title <br /> 24). <br /> (c) Provide one van parking space. <br /> 3) Provide restrooms conforming with all disabled access requirements (C.C.R., <br /> Title 24) Uniform Plumbing Code, Table 4-1. <br /> 4) Provide engineered plans for occupancy change, accessible restrooms and <br /> parking. <br /> MH:vb <br /> PA-0900094(SA)MHDC07152009 <br /> Attachments <br /> C: Markus & Elizabeth Bokisch <br /> Mike Smith Engineering <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.