Laserfiche WebLink
July 5, 1990 <br /> Contaminated Roadway and Channel Excavation (Beck Property) <br /> Page 2 <br /> The City will be awarding a contract to a general contractor for <br /> the Schulte Road project in the near future. Construction is <br /> anticipated to begin August 1, 1990. Project completion is <br /> projected to be October 1, 1991. Excavation and transport of <br /> contaminated materials within the Beck property, as described <br /> above, is included in the contract. Bioremidiation will be <br /> performed at a later date under a separate contract. <br /> We will keep you abreast of refinements in the construction <br /> schedule pertaining to work involving the contaminated materials <br /> as the project develops. <br /> If you have any specific concerns with this project, we would <br /> appreciate hearing from you at your earliest convenience. <br /> Sincerely, <br /> Paul S. Verma <br /> Civil Engineer III, Public Works Department <br /> CC: James L. Tjosvold, Senior Waste Management Engineer <br /> Department of Health Services <br /> David Brent, Regional Water Quality Control Board <br /> PSV: gs <br /> s01-0705. 90 <br />