Laserfiche WebLink
204 East Lodi Ave <br /> Page:2 <br /> ii <br /> In order to confirm the completion of the remediation efforts, it was recommended that confirmation soil <br /> borings be drilled and sampled in the area of MW1 and the former tank pit. PHS/EHD suggests that <br /> field activities be scheduled in February 1997. Also, please prepare a mass estimate"given current <br /> information for inclusion within the work plan describing the proposed field activities_ PHS/EHD also <br /> suggests that the work plan include sufficient analysis to evaluate the threat which any remaining <br /> petroleum hydrocarbons may pose to groundwater. <br /> If you have any questions or wish to schedule a site inspection, please contact me at (209) 468-0337. <br /> i3 <br /> Donna Heran, REHS, Director <br /> Environmental Health Division <br /> Mary Meays, Senior REHS Margaret agorio, REHS <br /> Site Mitigation Unit Supervisor <br /> i <br /> MM1204LOD1 <br /> �s <br /> c: Elizabeth Thayer, CVRWQCB <br /> c: ? James DeMera <br /> c: Bob Marty, Advanced GeoEnvironmental <br /> c: ',' John Giannoni <br /> C., ; Cleanup Fund, State Water Resources Control Board <br /> 5 . <br /> . i <br /> F <br /> Y <br /> �I <br /> {r <br /> 5�{5 <br /> 1� <br />