My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
40
>
2900 - Site Mitigation Program
>
PR0518875
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2019 3:32:58 PM
Creation date
11/12/2019 3:15:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0518875
PE
2960
FACILITY_ID
FA0014182
FACILITY_NAME
FORMER BUSY BEE CLEANERS
STREET_NUMBER
40
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
LODI
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
40 N MAIN ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E2C Remediation <br /> Environmental Engineering, <br /> Consulting and Remediation, Inc. <br /> March 22, 2007 <br /> Ms. Marie McCrink <br /> Regional Water Quality Control Board <br /> Central Valley Region <br /> 11020 Sun Center Drive, #200. <br /> Rancho Cordova, California 95670 - 6114 <br /> Subject: Proposed Well Sampling Program and Proposed Additional Deep <br /> Groundwater Monitoring Well <br /> Former Busy Bee Cleaners <br /> 40 North Main Street, Lodi, California <br /> Dear Ms. McCrink: <br /> On November 3, 2006 representatives of the Busy Bee site and the City of Lodi met to discuss <br /> current project status. In this meeting minor modifications to the project were discussed and <br /> tentatively agreed upon by both parties. This letter identifies the requested modifications. <br /> Revised Groundwater Monitoring Program <br /> Given the known information regarding the site and the nature of the solvent plume, it was <br /> agreed that sufficient groundwater analytical data exists to warrant a request for a reduction in <br /> sampling frequency at selected groundwater monitoring wells. Currently, twenty four (24) <br /> groundwater monitoring wells located at and in the vicinity of the Former Busy Bee Cleaners <br /> facility (the Site) located at 40 North Main Street in Lodi, California, are being sampled on a <br /> quarterly basis. Groundwater monitoring well locations are shown on Figure 1. <br /> This letter discusses the current groundwater monitoring well sampling program at the Site and <br /> certain modifications to the program as jointly proposed by Busy Bee and the City of Lodi. <br /> Groundwater samples have been collected quarterly in wells MW-1 BB through MW-6BB since <br /> April/May 2003. Additionally, groundwater samples have been collected quarterly in wells MW- <br /> 7BB through MW-17BB, DW-1 BB, DW-2BB, DW-3BB, and EX-1 BB since January 2004. Most <br /> recently, groundwater samples have been collected quarterly in wells MW-18BB, MW-19BB and <br /> MW-06 since September 2005. Each well currently being sampled quarterly has been <br /> evaluated individually to determine if a reduction in sampling frequency is warranted for that <br /> well. <br /> Based on a review of historical groundwater analytical data by EzC, the key quarter for sampling <br /> appears to be the third Quarter, because from 2003 through 2006 overall concentrations of PCE <br /> have appeared to be at their highest levels in the third quarter. As such, we are recommending <br /> that wells proposed for semiannual sampling should be sampled in the first and third quarters of <br /> each year. Any wells that are proposed for annual sampling should be sampled in the third <br /> quarter. <br /> 5300 Woodmere Drive,suite 105, Bakersfield,CA 93313 <br /> tel 661.831.6906 fax 661.831.6234 www.e2cr.net <br />
The URL can be used to link to this page
Your browser does not support the video tag.