My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FETEIRA
>
3251
>
2900 - Site Mitigation Program
>
PR0505477
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2019 3:49:43 PM
Creation date
12/9/2019 3:13:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0505477
PE
2950
FACILITY_ID
FA0006798
FACILITY_NAME
TRACY WESTGATE APTS
STREET_NUMBER
3251
STREET_NAME
FETEIRA
STREET_TYPE
WAY
City
TRACY
Zip
95376
APN
23808008
CURRENT_STATUS
02
SITE_LOCATION
3251 FETEIRA WAY
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
y . • <br /> 1 <br /> Environmental Health Department, San Joaquin County 5576.4.200.01 <br /> Westgate Apartments March 17, 2006 <br /> WORK PLAN FOR WELL ABANDONMENT Page 2 <br /> SCOPE OF SERVICES <br /> Our proposed scope includes drilling out the existing well and grouting the subsequent borehole. <br /> We will coordinate with a licensed drilling contractor to over-bore the well to a depth of <br /> approximately 15 feet bgs, or the bottom of the previous boring, whichever is deeper. Drilling <br /> will be accomplished using a truck-mounted hollow stem auger drill rig equipped with 8-inch <br /> diameter augers in order to remove the annular seal around the well. Given that the subsurface <br /> material is not suspected to be contaminated, drilling cuttings will be discharged on the ground <br /> surface near the well. <br /> Once the well has been adequately removed the borehole will be grouted with neat cement by <br /> tremie method to 5 feet bgs. Bentonite pellets will be placed in the remaining five feet to the <br /> ground surface. Bentonite pellets will be adequately hydrated. <br /> SCHEDULE <br /> We plan to complete the well destruction on March 23, 2006,pending approval of this work plan. <br /> If you have any questions on any portion of this work plan, please call and we will be glad to <br /> discuss them with you. <br /> Very truly yours, <br /> ENGEO INCORPORATED Reviewed by: <br /> ac CrawfordV <br /> uncan Hickmott <br /> zc/sc:workplan <br /> Attachments: Site Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.