Laserfiche WebLink
KLEINFELDER <br /> 6 ANTICIPATED SCHEDULE <br /> The proposed scope of work would be performed in accordance with the following approximate <br /> schedule. <br /> Approximate &TaskskTimeline <br /> Week 0 Formaovided by the EHDWeek 0 - 2 mittin 1Week 3 Field Work (assute Geo robe ri scheduling)Week 3 - 5 2 Chemicad Elevation SurveyWeek 5 - 7 e arationWeek 8 Reed to the client <br /> Kleinfelder has no control over the time required by a regulatory agency to review and approve a work plan and <br /> permit applications. Kleinfelder will make efforts to expedite their services. <br /> 2 This work would be done by a subcontractor. Kleinfelder selects reputable subcontractors, but, does not have <br /> full control over the time required by said companies. Kleinfelder will make efforts to expedite their services. <br /> 12255.CW1/STO2R980 Page 8 of 11 <br /> Copyright 2002,Kleinfelder,Inc. December l8,2002 <br />