My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012693
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FILBERT
>
110
>
3500 - Local Oversight Program
>
PR0545039
>
ARCHIVED REPORTS_XR0012693
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2019 2:43:32 PM
Creation date
12/10/2019 10:35:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012693
RECORD_ID
PR0545039
PE
3528
FACILITY_ID
FA0010186
FACILITY_NAME
DEL MONTE FOODS PLNT #33 - DISCO WH
STREET_NUMBER
110
Direction
N
STREET_NAME
FILBERT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15702009
CURRENT_STATUS
02
SITE_LOCATION
110 N FILBERT ST
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
707
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i , <br /> Del Monte AS/cat Cost Est <br /> i. <br /> Del Monte Plant 33 <br /> Air Stripper and Offgas Control (catalytic oxidation) <br /> SF031604.DA <br /> QTY Unit $/unit COST COMMENT <br /> 1 SITEWORK <br /> µ Site Preparation 1 LS 5,000 5,000 Allowance <br /> EQUIPMENT <br /> LL Flow EQ Tank 1 LS $6,000 $6,000 3,000 gal tank <br /> Influent Pumps 4 each $1,500 $6,000 <br /> Air Stripping System 2 each $15,000 $30,000 <br /> Acid Addition System 1 LS $4,000 $4,000 <br /> Caustic Add. System 1 LS $4,000 $4,000 <br /> Blowers 2 each $2,000 $4,000 <br /> Effluent Pumps 2 each $1,500 $3,000 <br /> Catalytic Ox Unit 1 LS $65,000 $65,000 <br /> K--------tea <br /> Subtotal a 127,000 <br /> Unquantified Items (5% of subtotal) 6,350 <br /> Freight Allowance (10% of subtotal) 12,700 <br /> Installation Allowance (15% of subtotal) 19,050 i <br /> Subtotal 165,100 . <br /> i <br /> Y e - <br /> i MECHVVICAL ( 15% of Equipment Total ) 24,765 <br /> m: ELECTRICAL ISC { 15% of Equipment Total ) 24,765 <br /> ----------- <br /> s CONSTRUCTION COST SUBTOTAL 214,630 <br /> Contingency ( 25% of CCS ) 53,658 i <br /> -R-s------- . <br /> TOTAL CONSTRUCTION COST 268,288 t <br /> Mob,Demob,Bonding, 6 Insurance ( 8% of TCC ) 21,463 i <br /> Permitting s Legal ( 5% of TCC ) 13,414 <br /> S Services During Construction ( 5% of TCC ) 13,419 <br /> Start-Up Costs ( 5% of TCC ) 13,414 ! <br /> ----------- <br /> T. TOTAL IMPLEMENTATION COST 329,993 r <br /> r Engineering Design Costs { 12% of TIC ) 39,599 <br /> TOTAL CAPITAL COST 370,000 <br /> 4 <br /> Page 1 <br /> t. <br /> k ; <br />
The URL can be used to link to this page
Your browser does not support the video tag.