Laserfiche WebLink
MWA AN <br /> Do! Monte AS/ at Cost Est <br /> =� Annual O&M Costs <br /> - _ QTY Unit $/unit Total Cost <br /> Labor 547.5 hr 25.00 $13,698 2 day/wk <br /> Maintenance 5& Const Cost+other $23,664 <br /> Catalyst Replacement $4,000 >' <br /> Poorer <br /> Stripper Pumps 7,423 Ker-hr 0.1 $742 <br /> 8loerers 58,550 Km-hr 0.1 $9,855 <br /> r <br /> Nat ural Gas 11,563 Therms 0.4 $4,625 <br /> Chemical Costs <br /> Hydrochloric Acid 1 LS 250 $250 Estimate <br /> Caustic <br /> 1 LS 750 $750 Estimate <br /> rte: <br /> } t <br /> l aa�a.es�a <br /> ` O&M Subtotal- $57,574 <br /> r ! <br /> Contingency (101 of subtotal) $5,757 <br /> O&M Total- $63,000 <br /> Yy i <br /> f y <br /> r✓• i i <br /> r <br /> Page 1 <br /> Z! <br />