Laserfiche WebLink
Thomas M. Gau -2- <br /> COMMENTS ON DEVELOPMENTS <br /> SA-98-53 <br /> 3 . Dedication of a 20-foot by 20-foot corner cut-off (snipe) at the corner <br /> of Mistletoe Avenue and "E" Street shall be required to allow for the <br /> handicap ramp. <br /> 4 . Construct curb, gutter and sidewalk along the frontage of the project <br /> with two (2) commercial driveways and a handicap ramp at the corner of <br /> Mistletoe Avenue and "E" Street. The new curb, gutter and sidewalk <br /> shall conform to the existing curb, gutter and sidewalk. Concrete <br /> gutters shall be water tested for drainage and the maximum deviation <br /> from a true grade shall not result in ponding water for a depth <br /> exceeding 0 . 02 foot . <br /> 5 . The Traffic Impact Mitigation Fee will be required for this <br /> development . The fee is due and payable at the time of building permit <br /> application. (The fee currently is $616 . 00 per 1, 000 gross square foot <br /> of building as manufacturing in the Stockton area. The fee shall be <br /> automatically adjusted July 1 of each year by the Engineering <br /> Construction Cost Index as published by the Engineering News Record. ) <br /> (Resolutions R-90-304, R-91-1025, R-93-167, R-94-179, R-95-650 and <br /> R-96-592) <br /> 6 . The Water Supply Facilities Impact Mitigation Fee will be required for <br /> this development . The fee is due and payable prior to issuance of the <br /> building permit . The fee currently is $147 . 00 per 1, 000 gross square <br /> foot of building as manufacturing. The fee shall be automatically <br /> increased on January 1 of each year through the year 2005 at the rate <br /> of 7 . 66 percent . <br /> (Development Title Section 9-818 .4 and Resolutions R-91-327, <br /> R-94-185 and R-97-5) <br /> 7 . A copy of the Final Site Plan shall be submitted prior to release of <br /> building permit . <br /> GK:RH: ti <br /> E: Manuel Lopez, Deputy Director/Development <br />