Laserfiche WebLink
Wildwood LNG Demonstration Facility <br /> 6. OPERATIONAL CONSIDERATIONS <br /> 6.1 Waste Stream Handling <br /> The facility will not generate any waste streams other than engine exhaust. Well gas containing <br /> methane and nitrogen will be the feed to the plant. Of the feed to the plant,between 65 and 70% <br /> of the methane will be recovered from the process as pure LNG. The residual methane and other <br /> materials contained in the feed gas (nitrogen, CO2, and trace amounts of non-methane <br /> hydrocarbons) will be piped to the engine-generator set as fuel for that unit. <br /> 6.2 Health and Safety Considerations <br /> The proposed project will not create health hazards to workers or the environment. The <br /> feedstock to the plant is natural gas, which, except for flammability is not considered hazardous. <br /> No waste streams will be produced from the demonstration plant other than engine-generator <br /> exhaust that will utilize BACT. <br /> Operation of the plant will be remotely monitored and fire detection is part of this system. <br /> Because the proposed project is a demonstration plant, permanent fire protection equipment, i.e. <br /> a permanent source of water, will not be required. Approved portable fire extinguishers will be <br /> provided. Approved and appropriate signage will be located on the perimeter fencing advising of <br /> potential hazards and providing emergency contact information. <br /> 6.3 Energy Utilization <br /> The proposed plant will be completely self-sufficient with regard to energy requirements. All of <br /> the electrical energy required for the operation will be generated on site using the non-pipeline <br /> quality natural gas feed to the plant as fuel. No connection to the electrical grid will be required. <br /> In addition to providing power for the actual liquefaction of the natural gas, sufficient power w <br /> be generated to supply the needs for the site lighting, truck scales, and the LNG dispensing <br /> facility. <br /> 6.4 Sewerage <br /> The proposed facility will be unmanned and with not incorporate sanitary facilities or wastewater <br /> disposal. Therefore sewer hookup is not required. <br /> AES Construction Group <br /> Page 12 <br />