My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008921
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
1400
>
3500 - Local Oversight Program
>
PR0545129
>
ARCHIVED REPORTS_XR0008921
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2020 11:26:14 PM
Creation date
1/7/2020 8:58:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008921
RECORD_ID
PR0545129
PE
3528
FACILITY_ID
FA0006171
FACILITY_NAME
Mizkan America, Inc.
STREET_NUMBER
1400
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95205-3743
APN
14115002
CURRENT_STATUS
02
SITE_LOCATION
1400 E WATERLOO RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
211
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
employees will be kept on site during all project site work Similar medical documentation <br /> for all IT project workers will be retained in the employee's home office <br /> Subcontractors shall certify that all their employees have successfully completed a physical <br /> examination by a qualified physician on the Certification Form The physical examinations <br /> shall meet the requirements of 29 CFR 1910 120, 29 CFR 1910 134, HS100 and HS101 <br /> 1 Subcontractors shall supply copies of the medical examination certificate for each on-site <br /> employee <br />' 10.1.1 Preplacement Examination <br /> All employees shall receive a preplacement medical exammanon prior to assignment to field <br /> Ioperations <br /> ' 10.1.2 Annual Examination <br /> Each year subsequent to the placement examination, all employees and subcontractors must <br /> undergo an annual examination similar in scope to the placement examination TT employees <br /> hired prior to 1985 are not required to submit to drug screening Chest X-rays are taken <br /> every third year The medical and occupational history is updated with each examination <br /> 10.1.3 Fxlf Examination <br /> IT employees receive an exit examination upon leaving the company if they have not been <br /> examined within the previous six months The exit examination consists of the annual <br /> examination without drug screen The employee's immediate supervisor is to notify the home <br /> office HS Assistant within a reasonable time before the termination to allow for the necessary <br /> ' arrangements <br /> ' 10.2 First-Aid and Medical Treatment <br /> All persons on site must report any near-miss incident, accident, injury, or illness to their <br /> immediate supervisor or the Project FC. Fust-aid will be provided by the designated site <br /> Ifirst-aid provider Injuries and illnesses requiring medical treatment will be accompanied by <br /> an "Authorization for Treatment" Form. The employee's supervisor or the FC will complete <br /> ' the "Supervisor's Employee Injury Report" and conduct an accident mvestigauon as soon as <br /> emergency conditions no longer exist and first-aid and/or medical treatment has been <br /> 1 <br /> • <br /> MZJi 1-29-94/RHS/HASP/94-0037 JAF 10-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.