My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
3505
>
2300 - Underground Storage Tank Program
>
PR0231848
>
COMPLIANCE INFO_2006 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2023 1:33:46 PM
Creation date
1/10/2020 1:36:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006 - 2018
RECORD_ID
PR0231848
PE
2361
FACILITY_ID
FA0002052
FACILITY_NAME
NuStar Terminals Operations Partnership L.P.
STREET_NUMBER
3505
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
16203004
CURRENT_STATUS
01
SITE_LOCATION
3505 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
307
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑ Piping Manufacturer ® Industry Standard ❑ Professional Engineer <br /> ❑ Other(Specify) <br /> Test Method Used: ® Pressure ❑ Vacuum ❑ Hydrostatic <br /> 3 <br /> _❑ Other(Specify) <br /> Test Equipment LJsed: Test reducer boots,Nitrogen and gauges Equipment Resolution: 0.5%of span <br /> Piping Run#Line A Piping Run#Line B <br /> Piping Material: Fiberglass Fiberglass <br /> Piping Manufacturer: Ameron Ameron <br /> Piping Diameter: 4" 4" <br /> Length of Piping Run: 300' 300' <br /> Product Stored: Diesel Diesel <br /> Method and location of Reducer boots/fittings Reducer boots/fittings <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure,/vacuum/water and 10 minutes 10 minutes <br /> -starting test: <br /> Test Start Time: 11:30 am 11:45 atn <br /> Initial Reading(Ri): 5 psi 5 psi <br /> Test End Time: 12:30 pm 12:45 pm <br /> Final Reading(RF): 5 psi 5 psi <br /> Test Duration: I hour 1 hour <br /> Change in Reading(RF-Rj): None None <br /> Pass/Fail Threshold or No detectable loss No detectable loss <br /> Criteria: <br /> Test Result: 0 Pass ❑Fail Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow up for failed tests) <br /> Line A—East Side Line <br /> Line B —West Side Line <br />
The URL can be used to link to this page
Your browser does not support the video tag.