Laserfiche WebLink
05 December 2007 <br /> AGE-NC Project No. 97-0327 <br /> Page 3 of 8 <br /> • Monitoring well MW-5 will be located between 95 and 105 feet south-southwest of well <br /> MW-4 to assess shallow 1.2-DCA-impacted ground water downgradient of MW-4. <br /> Soil samples will not be collected for laboratory analysis; however, soil samples will be collected <br /> at 5-foot intervals for logging purposes. Soil boring P-17Jwill I e only be advanced to approximately <br /> 55 feet bsg for collection of,a shallow grab ground water sample (i.e. first ground water); however, <br /> soil borings P-ly, and P-1�'will be advanced to depths of approximately 95 feet bsg for collection <br /> of shallow, intermediate (approximately 75 feet bsg) and deep grab ground water samples <br /> (approximately 95 feet bsg);monitoring well MW-5 will be advanced to a depth of 65 feet bsg.Total <br /> depth of each boring may vary slightly according to geologic conditions encountered during drilling. <br /> Field procedures for advancement of borings and well installation are presented in Section 3.1. <br /> Field procedures for grab ground water sample collection is presented in Section 3.2.; selected grab <br /> ground water samples will be analyzed by a State of California Department of Health Services <br /> (DHS)-certified laboratory for the following constituents: <br /> • Total petroleum hydrocarbons quantified as gasoline and diesel (TPIi-g and TPH-d <br /> respectively) in accordance with EPA Methods 8015 Modified and <br /> • Volatile aromatic compounds-benzene,toluene,ethylbenzene and xylenes(BTEX),methyl <br /> tert-butyl ether(MTBE), 1,2-dichloroethane(1,2-DCA),ethylene dibromide(EDB),tertiary <br /> butanol(TBA),di-isopropyl ether(DI PE),ethyl tert butyl ether(ETBE)and tert amyl methyl <br /> ether (TAME) by EPA Method 8260 Modified. <br /> Laboratory reports for the ground water analyses, testing methods, laboratory quality <br /> assurance/quality control (QA/QC) reports, and sample chain of custody documentation will be <br /> presented in a report with findings and recommendations. <br /> 2.3. MONITORING WELL DEVELOPMENT AND SURVEY <br /> The proposed soil boring MW-5 will be completed as a 2-inch diameter ground water monitoring <br /> well. Following well installation,the well will be developed to maximize water flow and minimize <br /> the amount of' fine-brained sediment drawn into the well during pumping or bailing. After <br /> development, the top of each well casing (well head) will be surveyed to determine its elevation <br /> relative to mean sea level and global positioning system(GPS)coordinates, for submittal to the State <br /> of California GeoTracker database. Procedures for well installation, development and survey are <br /> presented in Sections 3.1 through 3.4. <br /> Advanced GeoEnvironmental,Inc. <br />