Laserfiche WebLink
1 <br /> 1 <br /> I <br /> Soil Vapor Extraction with Carbon Adsorption <br />' Barnes Trucking Facility <br /> 1718 S Fresno St , Stockton, CA <br /> Description Rate Unit Count Total <br /> Consulting oversight 5,000 Est 1 5,000 <br /> Well installation (12 dual-phase & wells) 17,550 Est 1 17,550 <br /> Trench , compound, sys constr 20,000 Est 1 20,000 <br />' Utility connection 1,000 Est 1 1,000 <br /> O&M costs 1,000 Mo 12 12,000 <br /> 4,000 lbs vapor-phase GAC vessels 2,000 Ea 2 4,000 <br /> rBlower 4,000 Ea 1 4,000 <br /> Water knock-out, gauges, small parts 1,500 Ea 1 1,500 <br /> r Energy costs 300 Mo 12 3,600 <br /> 68,650 <br /> r Notes <br /> • assumes one year of operation without GAC switch-out <br /> r <br /> Additional Year of Operation <br /> rO&M costs 1,000 Mo 12 12,000 <br /> GAC recycling 5,000 Est 1 5,000 <br /> r Energy costs 200 Mo 12 2,400 <br /> 19,400 <br /> r <br /> r <br /> r <br /> r <br /> • <br /> r <br /> rZB178C SVE w/Carbon Cost Estimate October 22,2002 <br />