My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002480
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRESNO
>
1817
>
2900 - Site Mitigation Program
>
PR0540859
>
ARCHIVED REPORTS_XR0002480
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2020 4:14:00 PM
Creation date
1/15/2020 3:04:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002480
RECORD_ID
PR0540859
PE
2960
FACILITY_ID
FA0023361
FACILITY_NAME
PLAY N PARK (FORMER BARNES TRUCKING)
STREET_NUMBER
1817
Direction
S
STREET_NAME
FRESNO
STREET_TYPE
AVE
City
STOCKTON
Zip
95206
CURRENT_STATUS
01
SITE_LOCATION
1817 S FRESNO AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SSoil Excavation <br />' Barnes Trucking Facility <br /> 1718 S Fresno St , Stockton, CA <br />' Description Rate Unit Count Total <br />' Excavation of Contaminated Area wl Thermal Treatment <br /> Consulting oversight 6,000 Est 1 6,000 <br /> Destruction/Reinstallation of three wells 7,000 Est 1 7,000 <br /> Excavate soil (15,000 cubic yards) 2,000 Day 10 20,000 <br /> Transport(assume 60 loads at 2 hr RT) 80 Hour 120 9,600 <br />' Treatment (thermal destruction) 50 Ton 3,000 150,000 <br /> Backfill and compact 20,000 Est 1 20,000 <br /> Resurface 5,000 Est 1 5,000 <br />' Shoring 20,000 Est 1 20,000 <br /> Dewatering, treatment, and dispos to sewei 40,000 Est 1 40,000 <br /> 277,600 <br /> Excavation of Contaminated Area w/ On-Site Soil Aeration <br />' Consulting oversight 5,000 Est 1 5,000 <br /> Destruction/Reinstallation of three wells 7,000 Est 1 7,000 <br />' Excavate soil (15,000 cubic yards) 2,000 Day 10 20,000 <br /> Backfill and compact 20,000 Est 1 20,000 <br /> Resurface 5,000 Est 1 5,000 <br />' Shoring 20,000 Est 1 20,000 <br /> Dewatering, treatment, and dispos to sewer 10,000 Est 1 40,000 <br />' Soil handling post-aeration 2,000 Day 2 10,000 <br /> Transport (assume 60 loads at 2 hr RT) 80 Hour 120 9,600 <br /> 136,600 <br /> I <br /> I <br /> I <br /> ZB178C Soil Excavation Cost Estimate October 22,2002 <br />
The URL can be used to link to this page
Your browser does not support the video tag.