Laserfiche WebLink
--- - <br /> FAST-TEK Engineering Support Service. <br /> € ISOC SYSTEM FIELD MONITORING DATA <br /> CLIENT: <br /> PROJECT NAME: Barnes trucking Date: 11-411!4104 <br /> PROJECT NUMBER: ZB178F TECHNICIAN: Eric V.Austin <br /> SYSTEM STATE DESCRIPTION UTILITIES <br /> InVentures ISOC system lOxygen Cylinder <br /> Initial install I LA J Routine maintenance <br /> ARRIVAL TIME DEPARTURE TIME <br /> Arrival System On?(YIN) Time: . ''•C Departure System On?(YIN) <br /> Oxygen Cylinder ON? Yes ! No Oxygen Cylinder ON? <br /> Tank Pressure Op si Tank Pressure psi <br /> Line Pressure psi Line Pressure psi <br /> Adjustment of Gauges <br /> ISOC(IW-1) Before ISOC(MW-) After <br /> Inlet Pressure " psi Inlet Pressure psi <br /> Flow Rate Z '--c/min Flow Rate cc 1 min <br /> Well Pressure psi Well Pressure psi <br /> ISOC(IW-2) ISOC(MW-) <br /> Inlet Pressure psi Inlet Pressure psi <br /> Flow Rate 2 d cc l min Flow Rate cc/min <br /> Well Pressure psi Well Pressure psi <br /> ISOC(IW-3) ISOC(MW-) <br /> Inlet Pressure psi . Inlet Pressure si <br /> Z <br /> Flow Rate Z c7 cc 1 min. FloW Rate cc 1 min <br /> Well Pressure IT. 51 T ps€ Well Pressure psi <br /> ISOC(IW-4) f ISOG(MW-) <br /> Inlet Pressure psi Inlet Pressure psi <br /> Flow Rate 2 D cc 1-rnin Flow Rate cc 1 min <br /> Well Pressure si Well Pressure psi <br /> WELL DATA WELL DATA <br /> is"i Well # DTW DO ORP FE FE2+ PH TEMP. COND. <br /> IW-1 <br /> =`I IW-2 /1.0 "�Z L <br /> IW-3 <br /> IW-4 11 Z _ Oz <br /> IW-5 ll.L L. <br /> 41 IW-6 I, o <br /> MAINTENANCEIDATA COLLECTION CHECKLIST(Check Items Completed) <br /> Item Check Description Schedule: <br /> Oxygen Cylinder X psi % full every visit <br /> ISOC Control Panel X every visit <br /> Housekeeping X every visit <br /> Other Maintenance Performed Sample check <br /> i <br />